FIELD: construction, particularly artificial islands mounted on piles or like supports, for example, platforms on raisable legs to be erected in wide ambient condition and surface ground characteristic range, in flood plains, water-logged ground, in permafrost zones, sandy ground characterized by varying relief and marine platforms to be erected at any depth.
SUBSTANCE: method for processing platform erection in surface ground involves installing support slab having central depression; forming wells provided with head connectors in the depression; installing load-bearing processing equipment structure on the support slab. The support slab includes rigidly connected central and peripheral parts fastened to ground by means of central and peripheral cemented piles provided with main tensioning connections. Load-bearing processing equipment structure is made as integral truss or truss composed of several modules and is connected to support slab by means of additional tensioning connections.
EFFECT: extended field of processing platform usage.
4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTING PROCESS PLATFORMS | 2007 |
|
RU2347866C2 |
METHOD FOR ERECTION OF MULTI-SUPPORT TECHNOLOGICAL PLATFORM | 2007 |
|
RU2361039C2 |
METHOD OF ERECTION OF MARINE PLATFORM | 2001 |
|
RU2198261C1 |
PROCEDURE FOR EQUIPPING SEA DEPOSIT WITH UNIFIED TECHNIQUE | 2007 |
|
RU2363810C1 |
METHOD FOR OFFSHORE PLATFORM ERECTION | 2004 |
|
RU2280128C1 |
PROCESS OF CONSTRUCTION OF SEA TECHNOLOGICAL COMPLEX | 2002 |
|
RU2225476C1 |
METHOD FOR ERECTION OF MARINE PROCESS COMPLEX | 2009 |
|
RU2405084C1 |
METHOD FOR MARINE PRODUCTION COMPLEX ERECTION | 2006 |
|
RU2307893C1 |
OFF-SHORE PLATFORM CONSTRUCTION METHOD | 2003 |
|
RU2232227C1 |
METHOD FOR CONSTRUCTING ARCTIC PLATFORM | 2003 |
|
RU2238365C1 |
Authors
Dates
2007-10-10—Published
2006-04-27—Filed