FIELD: liquid and gaseous underwater deposit development, production complex erection in wide range of ambient conditions and sea bed ground characteristics.
SUBSTANCE: method involves installing production complex module in vertical guiders with the use of hoisting device of main vehicle; lowering the module to predetermined level necessary for module joining with previously installed one with the use of hydraulic drive including rack gearing having rack connected to each production complex module; performing serial module joining for sea bottom reaching and up to predetermined support structure height with respect to sea level.
EFFECT: increased range of complex installation depths, possibility of production complex module standardization along with increased simplicity of module erection technology.
6 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR EQUIPPING SEA DEPOSIT WITH UNIFIED TECHNIQUE | 2007 |
|
RU2363810C1 |
PROCESS OF CONSTRUCTION OF SEA TECHNOLOGICAL COMPLEX | 2002 |
|
RU2225476C1 |
PROCESS OF CONSTRUCTION OF OFF-SHORE TECHNOLOGICAL COMPLEX FOR EXTRACTION OF MINERAL WEALTH | 2001 |
|
RU2219312C2 |
METHOD FOR ERECTION OF MARINE PROCESS COMPLEX | 2009 |
|
RU2405084C1 |
METHOD FOR ERECTION OF MULTI-SUPPORT TECHNOLOGICAL PLATFORM | 2007 |
|
RU2361039C2 |
PROCESS OF ERECTION OF DEEP-SEA PLATFORM | 2002 |
|
RU2229556C1 |
METHOD FOR CONSTRUCTING ARCTIC PLATFORM | 2003 |
|
RU2238365C1 |
METHOD OF ERECTION OF MARINE PLATFORM | 2001 |
|
RU2198261C1 |
METHOD FOR OFFSHORE PLATFORM ERECTION | 2004 |
|
RU2280128C1 |
METHOD FOR PROCESSING PLATFORM ERECTION | 2006 |
|
RU2307894C1 |
Authors
Dates
2007-10-10—Published
2006-01-25—Filed