FIELD: construction.
SUBSTANCE: invention is related to construction and operation of offshore technological platforms. Method, in which base is installed on support part arranged in the form of support plate, support plate is rigidly connected to hard ground with the help of cemented piles, base is fixed to support part with the help of anchor power joints, process wells with wellhead connectors are installed in central part of base. Base is arranged in the form of multi-support rod system, every rod support of which is made of rod space modules, space rod modules are connected to each other, to support plate and horizontal platform with the help of quick-split connections in accordance with specified height, process equipment is installed on horizontal platform directly or with the help of semi-submerged module.
EFFECT: increased reliability and speed of offshore platforms erection.
5 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTING PROCESS PLATFORMS | 2007 |
|
RU2347866C2 |
METHOD FOR OFFSHORE PLATFORM ERECTION | 2004 |
|
RU2280128C1 |
METHOD FOR ERECTION OF MARINE PROCESS COMPLEX | 2009 |
|
RU2405084C1 |
PROCEDURE FOR EQUIPPING SEA DEPOSIT WITH UNIFIED TECHNIQUE | 2007 |
|
RU2363810C1 |
METHOD FOR PROCESSING PLATFORM ERECTION | 2006 |
|
RU2307894C1 |
METHOD FOR MARINE PRODUCTION COMPLEX ERECTION | 2006 |
|
RU2307893C1 |
METHOD OF ARRANGEMENT OF ARCTIC TECHNOLOGICAL COMPLEX | 2005 |
|
RU2288994C1 |
METHOD FOR MARINE GAS-FIELD DEVELOPMENT | 2005 |
|
RU2296836C1 |
METHOD FOR CONSTRUCTING ARCTIC PLATFORM | 2003 |
|
RU2238365C1 |
PROCESS OF CONSTRUCTION OF SEA TECHNOLOGICAL COMPLEX | 2002 |
|
RU2225476C1 |
Authors
Dates
2009-07-10—Published
2007-02-19—Filed