FIELD: explosive works.
SUBSTANCE: invention relates to mining engineering and can be used for hole loading when carrying out explosive works in mining engineering and construction. Formation method of compound blast provides for forming blast from water-resistant blasting powder in water-cut hole part, placing foamed polystyrene on the mirror of water displaced upward the hole, forming blast from non-water-resistant blasting powder on it and installing stem. Float, made from material with flotation properties and able to stand weight of blast obtained from non-water-resistant blasting powder, is placed on the mirror of water displaced upward the hole. Pieces of rocks or drill cuttings in tissular or polyethylene envelope with diametre not bigger than hole diametre are put onto the float.
EFFECT: reducing cost of explosive works production due to replacing expensive water-resistant blasting powder with cheaper non-water-resistant blasting powder and simplifying water-cut hole loading.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
COMBINED CHARGE SHAPING METHOD | 2010 |
|
RU2425324C1 |
UNIVERSAL CHARGING SLEEVE | 2019 |
|
RU2716067C1 |
METHOD TO CHARGE WEAKLY WATER-CUT DOWNHOLES | 2011 |
|
RU2482442C1 |
METHOD FOR DISPERSAL OF CHARGE IN WATERED WELL AND DEVICE FOR ITS REALISATION | 2008 |
|
RU2374603C1 |
SUSPENDED WELL STEM | 2009 |
|
RU2419063C1 |
METHOD FOR CHARGE DISPERSAL IN BOREHOLE | 2006 |
|
RU2319924C1 |
METHOD FOR CHARGE DISPERSAL IN HOLE | 2008 |
|
RU2379621C1 |
METHOD FOR FORMING OF COMBINED CHARGE AND METAL STEMMING FOR ITS REALIZATION | 2006 |
|
RU2312300C1 |
SUSPENSION WELL STEMMING | 2009 |
|
RU2409805C1 |
METHOD OF DISPERSION OF A CHARGE IN A BOREHOLE | 2003 |
|
RU2235971C1 |
Authors
Dates
2009-08-20—Published
2008-02-18—Filed