FIELD: mining.
SUBSTANCE: method includes preliminary drying of a wall, lowering of a hydraulic insulating sleeve into it with a closed lower end, fixation of an upper end of the sleeve, charging of a non-waterproof explosive into the sleeve. The part of the hydraulic insulation sleeve with the closed lower end is used, the length of which is by 30-40 cm exceeds the height of the water column in the well before drying. The upper end of this part of the sleeve is pre-reinforced and fixed inside the well with the help of a rope, one end of which is attached to the upper reinforced end of the hydraulic insulation sleeve part, and the other one is fixed on the day surface.
EFFECT: reduced consumption of a hydraulic insulation sleeve, its weight, simplified stemming.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
WELL CHARGING METHOD | 2024 |
|
RU2823312C1 |
UNIVERSAL CHARGING SLEEVE | 2019 |
|
RU2716067C1 |
FORMATION METHOD OF COMPOUND BLAST | 2008 |
|
RU2364828C1 |
PROCESS OF CHARGING OF DESCENDING HOLES WITH EXPLOSIVE | 1997 |
|
RU2131584C1 |
COMBINED CHARGE SHAPING METHOD | 2010 |
|
RU2425324C1 |
METHOD TO CHARGE WATER DOWN-HOLES | 2006 |
|
RU2419064C2 |
DRYING METHOD OF ROCK-COAL MASSIF | 2010 |
|
RU2454541C1 |
SUSPENDED BOREHOLE STEM | 2021 |
|
RU2768270C1 |
DRYING METHOD OF BLOCK TO BE EXPLODED DURING DIRECT COAL EXTRACTION TECHNOLOGY | 2010 |
|
RU2452859C1 |
METHOD FOR CHARGE DISPERSAL IN BOREHOLE | 2006 |
|
RU2319924C1 |
Authors
Dates
2013-05-20—Published
2011-12-02—Filed