FIELD: mining.
SUBSTANCE: combined charge shaping method involves formation of charge in water-flooded part of the well from water-resistant explosive, arrangement on mirror of water displaced upwards in the well of the mixture consisting of the material having floating properties, capable of withstanding the weight of charge from non-water-resistant explosive, on which non-water-resistant explosive is lowered. At that, material having floating properties and binding agent are pre-mixed; the obtained mixture is poured on surface of water displaced upwards with water-resistant explosive; after mixture is moistened due to contact with water, it is left in the well for the period required for mixture to cure on water surface, and after the obtained mixture is cured, non-water-resistant explosive is arranged on it.
EFFECT: enlarging the capabilities of the material having floating properties, and reducing the manufacturing cost of blasting operations.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
FORMATION METHOD OF COMPOUND BLAST | 2008 |
|
RU2364828C1 |
UNIVERSAL CHARGING SLEEVE | 2019 |
|
RU2716067C1 |
METHOD TO CHARGE WEAKLY WATER-CUT DOWNHOLES | 2011 |
|
RU2482442C1 |
WELL CHARGING METHOD | 2024 |
|
RU2823312C1 |
METHOD OF RUNNING OF THE BLASTING OPERATIONS IN THE FLOODED WELL USING THE CHARGE OF THE EMULSION BLASTING EXPLOSIVE | 2006 |
|
RU2305673C1 |
METHOD FOR CHARGE DISPERSAL IN BOREHOLE | 2006 |
|
RU2319924C1 |
METHOD FOR FORMING OF COMBINED CHARGE AND METAL STEMMING FOR ITS REALIZATION | 2006 |
|
RU2312300C1 |
METHOD FOR DISPERSAL OF CHARGE IN WATERED WELL AND DEVICE FOR ITS REALISATION | 2008 |
|
RU2374603C1 |
METHOD FOR DISTRIBUTION OF CHARGE IN A DEEP HOLE | 2005 |
|
RU2285895C1 |
METHOD FOR FORMING OF SPACE-CHARGE OF EXPLOSIVES IN PARTIALLY FLOODED HOLES | 2006 |
|
RU2310158C1 |
Authors
Dates
2011-07-27—Published
2010-05-12—Filed