FIELD: construction.
SUBSTANCE: pipeline has the compensating part mounted in the trench provided with gently sloping sides. The depth of the trench is larger than the outer diameter of the pipeline by a factor of 2.5-4. The pipeline is mounted in the middle part of the layer of sand filler which fills the trench up to the height no less than twice outer diameter of the pipeline. The sand filler is made of riverine sand of intermediate grain size or course sand which contain no dust or clay inclusions.
EFFECT: enhanced safety of pipeline operation.
10 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO INSTALL UNDERGROUND PIPELINE WHEN CROSSING ACTIVE SEISMOTECTONIC AREA | 2012 |
|
RU2509249C2 |
METHOD OF CONSTRUCTING BURIED PIPELINE IN CROSSING SECTION WITH FORECAST CONCENTRATED DEFORMATIONS OF ENCLOSING STRATA | 2011 |
|
RU2460926C1 |
METHOD TO INSTALL PIPELINES IN SEISMIC REGIONS | 2010 |
|
RU2447348C2 |
METHOD OF BUILDING UNDERGROUND PIPELINE ON TECTONIC FRACTURE SECTIONS | 2003 |
|
RU2262631C2 |
METHOD FOR SELECTION OF MAIN STRUCTURES ROUTE LOCATION IN SEISMIC REGIONS FOR PREVENTION OF DISASTROUS CONSEQUENCES OF EARTHQUAKES | 2008 |
|
RU2364897C1 |
DEVICE FOR SECURING PIPE LINE | 2001 |
|
RU2193714C1 |
METHOD FOR ERECTION OF UNDERGROUND PIPELINE AT CROSSING OF TECTONIC FRACTURES | 2008 |
|
RU2363875C1 |
METHOD OF CONSTRUCTION OF UNDERGROUND PIPELINE IN SECTION OF TECTONIC FAULTS | 2000 |
|
RU2197667C2 |
METHOD OF LAYING PIPELINES OVER TECTONIC FAULT | 2004 |
|
RU2264577C1 |
METHOD OF LAYING UNDERGROUND PIPELINE | 2003 |
|
RU2256839C2 |
Authors
Dates
2004-12-10—Published
2001-01-19—Filed