FIELD: construction.
SUBSTANCE: invention is related to the field of construction or repair of oil and gas pipelines and other engineering communications, in particular for reinforcement of walls in trenches of pits dug in ground during performance of repair or installation of pipelines of main and field oil and gas pipelines under conditions of looseness and floatage of grounds, also under conditions when possibility is not available to dig trenches by stockpile method. Fencing of working zone for performance of repair works of deepened sections of gas line consists of two walls and frame assembled from 2 spacers and 5 rods. Metal-plastic walls consist of frame welded from aluminium profile, two linings of glass-cloth laminate and filler from foamed self-extinguishing polystyrene. Spacers and rods are arranged as integral from rolled aluminium.
EFFECT: reduced weight of structure elements, possibility of sectional assembly of fencing in site of works performance and possibility to perform assembly manually without application of weight-lifting mechanisms by team of 4 people.
5 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
TRENCH FASTENING FOR REPAIR WORKS ON PIPELINE | 2024 |
|
RU2823933C1 |
FOLDING TRENCH ATTACHMENT WITH CANOPY FOR WELDING | 2021 |
|
RU2773569C1 |
ALL-PURPOSE MODULAR FORM ASSEMBLY | 2005 |
|
RU2282700C1 |
METHOD OF ERECTION OF THREE-DIMENSIONAL CAST-IN-SITU STRUCTURES | 1995 |
|
RU2079617C1 |
METHOD FOR CONSTRUCTION OF TRENCH BOX AND TRENCH BOX | 2021 |
|
RU2776540C1 |
GARAGE DEVICE | 2011 |
|
RU2455438C1 |
EARTHQUAKE-RESISTANT FRAME BUILDING | 2018 |
|
RU2693100C1 |
ARRANGEMENT FOR REINFORCING TRENCH WALLS | 0 |
|
SU1296688A1 |
SUPPORT FOR TRENCHES | 0 |
|
SU985195A1 |
METHOD AND ANCHOR SYSTEM FOR SECURING PIT BORDERING | 2003 |
|
RU2254417C1 |
Authors
Dates
2009-09-10—Published
2007-04-26—Filed