FIELD: oil and gas production.
SUBSTANCE: invention refers to oil and gas industry, particularly to lowering and cementing cased column in well. The procedure consists in lowering cased column equipped with centralisers, in arranging centralisers opposite to reservoirs with caverns, and in producing dynamic effect to caverns with rising stream of flush fluid at well flushing and with cement grout at cementing the cased column; also dynamic effect is generated with centrifugal forces to rising stream of flush fluid and cement grout by means of centralisers; each centraliser contains a case with spiral shaped ribs integrated with the case. Fluid containing reagents with properties for flushing structured drilling agent and thickened adhesion film on walls of caverns is chosen as flush fluid.
EFFECT: upgraded quality of well casing due to most efficient process of removing structured drilling agent and thickened on walls of caverns adhesion film from caverns.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDRO-JET-MECHANICAL PROCEDURE FOR DECREASING PERMEABILITY OF WELL WALLS | 2010 |
|
RU2428560C1 |
METHOD OF PREPARATION FOR CEMENTING OF WELLS DRILLED USING INVERT-EMULSION DRILLING MUD | 2010 |
|
RU2452849C1 |
METHOD FOR STRING CEMENTING IN WELL USING CEMENT MORTAR WITH EROSION PROPERTIES | 2009 |
|
RU2398095C1 |
METHOD OF CEMENTATION TOP STAGE OF CASING PIPE IN WELL | 2008 |
|
RU2386013C1 |
PROCEDURE FOR FIXING WELL WITH CEMENT GROUT | 2009 |
|
RU2398955C1 |
METHOD TO STRENGTHEN WELL AND DEVICE FOR ITS IMPLEMENTATION | 2000 |
|
RU2190754C2 |
METHOD OF PREPARING WELLS TO CEMENTATION | 1999 |
|
RU2137906C1 |
COMPLEX METHOD FOR WELL BORE PREPARATION FOR CASING | 2006 |
|
RU2318980C2 |
METHOD FOR CEMENTING OIL AND GAS WELLS AND DEVICE FOR REALIZATION OF SAID METHOD | 2005 |
|
RU2291948C1 |
METHOD FOR PREPARING WELL TO LOWERING AND CEMENTATION OF CASING STRING | 1998 |
|
RU2144609C1 |
Authors
Dates
2009-09-10—Published
2007-02-26—Filed