FIELD: construction of wells, strengthening of oil and gas wells when presence of penetrable formations is proved. SUBSTANCE: scrapers are put on drill pipe string. Casing is attached to lower part of drill pipe string. Centralizer and centralizer-turbolizer are positioned on casing. Scrapers are set between them. Drill pipe string is run into well to setting. Clay coating is removed and well is gauged. Shaft of well is flushed. Centralizers and scrapers are mounted on casing string. Well is cased and scrapers are set close to penetrable formations. Reinforced cement stone is obtained in points of their setting. Device for implementation of method has drill pipe string, scraper for removal of clay coating prior to cementing, casing string with centralizers and scrapers put on it. Casing to gauge shaft of well is attached to lower part of drill pipe string. Scrapers to remove clay coating are put on casing between centralizer and centralizer-turbolizer. Scrapers of casing string are mounted for setting near penetrable formations, cavern pockets or between oil- and water-bearing beds and for obtainment of cement stone there. Scrapers have tubular body. Pairs of holes are drilled in body along its generating line. Scrapers are passed through these holes. Body of scrapers is fixed with the help of fixing member that comes in the form of hollow cylinder made interference fit inside body. EFFECT: simplified technology and enhanced reliability of device with use of simpler technical aids. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR INCREASING STRENGTH OF CONTACT OF ANNULUS CEMENT STONE WITH ENVIRONMENT IN WELL | 2007 |
|
RU2366800C2 |
CENTERING MOUNT-TURBOLATOR FOR CASING STRING | 1998 |
|
RU2159839C2 |
COMPLEX METHOD FOR WELL BORE PREPARATION FOR CASING | 2006 |
|
RU2318980C2 |
CENTRALIZER FOR CASING PIPE USED IN WELL DRILLED BY TRICONE DRILLING BIT | 2004 |
|
RU2275488C1 |
METHOD FOR RECOVERY OF RESERVOIR NATURAL PROPERTIES, IMPAIRED DURING ITS OPENING WITH BORING | 2008 |
|
RU2382188C1 |
HYDRO-JET-MECHANICAL PROCEDURE FOR DECREASING PERMEABILITY OF WELL WALLS | 2010 |
|
RU2428560C1 |
METHOD OF CEMENTATION TOP STAGE OF CASING PIPE IN WELL | 2008 |
|
RU2386013C1 |
CASING STRING CENTRALIZER OF WELL DRILLED BY THREE-CONE DRILLING BIT | 2000 |
|
RU2176718C1 |
METHOD FIXING OIL AND GAS WELLS | 2002 |
|
RU2219329C1 |
METHOD OF WELLS CEMENTING | 2006 |
|
RU2330935C2 |
Authors
Dates
2002-10-10—Published
2000-06-16—Filed