FIELD: oil and gas production industry, particularly oil and gas well construction, namely methods or apparatus for flushing boreholes.
SUBSTANCE: method involves removing mud filter cake; creating mudding screen by water-jet well bore wall treatment; chemically treating well bore walls by serially forcing buffer process water taken in amount of not less than 2 m3, aqueous CaCl2 solution or reservoir Devonian fluid taken in amount of not less than 2 m3 in casing annulus to obtain equilibrium state; injecting aqueous liquid glass solution including 4-8 kg of polymeric reagent per 30-50 l of aqueous liquid glass in amount of not less than 3 m3; bringing thereof to ground surface.
EFFECT: increased reliability of small pore and fissure plugging in reservoirs in well bore zone without local hydraulic fracturing creation; provision of adhesive drilling mud film modification on well wall.
3 cl
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR INCREASING STRENGTH OF CONTACT OF ANNULUS CEMENT STONE WITH ENVIRONMENT IN WELL | 2007 |
|
RU2366800C2 |
HYDRO-JET-MECHANICAL PROCEDURE FOR DECREASING PERMEABILITY OF WELL WALLS | 2010 |
|
RU2428560C1 |
JETTING ROPE SCRAPER | 2014 |
|
RU2571475C1 |
PROCEDURE FOR FIXING WELL WITH CEMENT GROUT | 2009 |
|
RU2398955C1 |
METHOD FOR STRING CEMENTING IN WELL USING CEMENT MORTAR WITH EROSION PROPERTIES | 2009 |
|
RU2398095C1 |
METHOD OF SECURING WELLS | 0 |
|
SU883334A1 |
METHOD OF PREPARING WELLS TO CEMENTATION | 1999 |
|
RU2137906C1 |
METHOD FOR RECOVERY OF RESERVOIR NATURAL PROPERTIES, IMPAIRED DURING ITS OPENING WITH BORING | 2008 |
|
RU2382188C1 |
METHOD FOR WELL CASING WITH RESERVOIR PROPERTIES RETENTION IN PRODUCTIVE BED | 2003 |
|
RU2268351C2 |
METHOD OF WELL DRILLING | 1998 |
|
RU2146690C1 |
Authors
Dates
2008-03-10—Published
2006-02-17—Filed