METHOD FOR DEVELOPMENT OF GAS OR GAS-CONDENSATE DEPOSIT Russian patent published in 2009 - IPC E21B43/00 E21B33/03 

Abstract RU 2373380 C1

FIELD: oil and gas production.

SUBSTANCE: invention is related to mining industry and may be used to develop gas, gas-condensate deposit for operative control and correction of formation fluid production process parametres. In method, production of formation fluid from deposit objects is done via operational wells combined with aprons and/or at least a single gas-collecting header into system of gas collection, arranged in accordance with a group centralised scheme, used to combine wells in clusters and to communicate them by means of aprons to plant attached to cluster for preliminary preparation of formation fluid, preferably, gas, gas condensate. At the same time specified plants are used to preliminarily separate of formation fluid. Each specified plant is connected by means of gas-collecting header to a gas-collection station that communicates to main gas line at the outlet, where complex separation of formation fluid is carried out, at least part of cleaned gas produced as a result of it is sent to main gas line. At least one operational well included into cluster is equipped with systems of operative, as well as remote control and generation of commands to correct parametres of formation fluid production process, and also with actuating mechanisms for realisation of specified correction, which is arranged in three levels of efficiency: the first level - instantaneous automatic disconnection of formation fluid, mostly, produced gas flow, gas condensate in case of emergency debit rise; the second level - smoothly going operative process in case of planned connection-disconnection of formation fluid supply or current variation of debit; and the third level - planned level, related to disconnection of flow string and/or disconnection of productive bed, well plugging or its changeover to fluid production from new bed. In order to realise the second level of fluid production process efficiency in composition of control equipment, at least one control valve is installed, which comprises body with central channel with a cell stop unit installed in it, with supply and drain nozzles and combined driving mechanism, which consists of at least of two driving mechanisms of single-directed action and single mechanism of counter-directed action. Cell stop unit includes at least a throttling gate valve. At the same time mentioned gate is rigidly connected to stem, on which mentioned driving mechanism are serially installed with a partial overlapping in length with the possibility of autonomous action, and one of them is arranged as main and hydraulic, and the other one - a duplicating mechanical or manual one, and the third mechanism of counter-directed action that combines and supplements them, is arranged in the form of automatic mechanism of stem reciprocal motions with the possibility for it to accumulate kinetic energy transformed into potential one in process of motion aimed at opening of control valve with main or duplicating driving mechanisms.

EFFECT: improved efficiency of deposit operation by faster reaction and improved quality of reaction to dynamic changes in process of formation fluid production, more efficient prevention of emergencies, reduced ecological contamination of environment with a produced formation fluid.

24 cl, 10 dwg

Similar patents RU2373380C1

Title Year Author Number
PROCEDURE OF OPERATING GAS FIELD AND GAS-CONDENSATE FIELD 2008
RU2372473C1
METHOD FOR DEVELOPMENT OF GAS OR GAS-CONDENSATE DEPOSIT 2008
RU2373381C1
GAS WELL, REGULATING VALVE, COMBINATION ACTUATOR OF REGULATING VALVE FOR GAS WELL 2008
RU2372468C1
METHOD FOR OPERATING GAS WELLS AT LATER STAGE OF NATURAL GAS FIELD DEVELOPMENT AND DEVICE FOR ITS IMPLEMENTATION 2021
  • Arno Oleg Borisovich
  • Arabskij Anatolij Kuzmich
  • Kushch Ivan Ivanovich
  • Mukhametchin Rishat Renatovich
  • Sopnev Timur Vladimirovich
  • Ponomarev Aleksandr Iosifovich
RU2760183C1
METHOD AND INSTALLATION FOR PREPARING GAS FOR TRANSPORT 1988
  • Rakovskij Vladimir Fedorovich
RU2091431C1
DEVICE AND SYSTEM (VERSIONS) FOR INCREASE OF LIQUID RECOVERY FROM UNDERGROUND BEDS 1997
  • Kelli Terri E.
  • Snajder Robert E.
RU2196892C2
METHOD OF UNINTERRUPTED OPERATION OF GAS AND GAS CONDENSATE WELLS, PROVIDING REMOVAL OF ACCUMULATED BOTTOMHOLE FLUID 2019
  • Bilyanskij Nikolaj Vasilevich
  • Khromtsov Aleksej Viktorovich
  • Semenov Sergej Vitalevich
  • Terekhanov Aleksandr Anatolevich
RU2722897C1
METHOD FOR COMPLEX PRODUCTION OF HYDROCARBONS FROM OIL AND GAS CONDENSATE WELLS AND A SYSTEM FOR ITS IMPLEMENTATION 2020
  • Poushev Andrei Viktorovich
  • Iazkov Aleksei Viktorovich
RU2756650C1
METHOD FOR STUDY OF PRODUCING FORMATION IN NATURAL PRESSURE GAS-LIFT WELL OPERATION 1993
  • Basniev Kaplan Saferbievich[Ru]
  • Zajtsev Igor' Jur'Evich[Ru]
  • Tverkovkin Mikhail Vladimirovich[Ru]
  • Osipov Al'Bert Nikolaevich[Ru]
  • Tegispaev Anatolij Urengalievich[Kz]
  • Komarov Jurij Nikolaevich[Kz]
RU2067171C1
METHOD OF GAS CONDENSATE WELL DEVELOPMENT AFTER FORMATION HYDRAULIC FRACTURING 2023
  • Solovev Vladimir Vladimirovich
  • Deviatov Andrei Sergeevich
RU2813500C1

RU 2 373 380 C1

Authors

Dates

2009-11-20Published

2008-06-18Filed