DEVICE AND SYSTEM (VERSIONS) FOR INCREASE OF LIQUID RECOVERY FROM UNDERGROUND BEDS Russian patent published in 2003 - IPC

Abstract RU 2196892 C2

FIELD: separators for separation of gas from liquid in well and prevention of gas getting into production string and fluid passage in liquid state. SUBSTANCE: system for liquid recovery from bed has downhole injector ensuring passage of bed fluids to production string and preventing passage of gases. Packer is located above injector. Ventilating pipe for gases runs through packer. Annular space above packer is communicated with production string above packer through one or more through holes for fluid passage. Injector has case with seat of cutoff valve, locking member of cutoff valve. There is a fluid sensitive float and movable relative to case. Located in injector case, across inlet hole is a strainer. Locking member of cutoff valve is located along vertical at a distance from check valve within nominal outer diameters of injector case. EFFECT: higher reliability in prevention of gas getting into production string, increased service life of submersible pumps. 12 cl, 12 dwg

Similar patents RU2196892C2

Title Year Author Number
METHOD FOR COMPLEX PRODUCTION OF HYDROCARBONS FROM OIL AND GAS CONDENSATE WELLS AND A SYSTEM FOR ITS IMPLEMENTATION 2020
  • Poushev Andrei Viktorovich
  • Iazkov Aleksei Viktorovich
RU2756650C1
PROCEDURE FOR SIMULTANEOUS OPERATION OF SEVERAL OBJECTS IN PRODUCER AND DEVICE FOR ITS IMPLEMENTATION 2010
  • Temirov Velijulla Gamdullaevich
  • Sarkarov Ramidin Akberbubaevich
  • Seleznev Vjacheslav Vasil'Evich
RU2438008C1
METHOD OF SIMULTANEOUS-SEPARATE DEVELOPMENT OF SEVERAL PRODUCTIVE FORMATIONS AND WELL UNIT FOR METHOD EMBODIMENT 2001
  • Leonov V.A.
  • Sharifov Makhir Zafar Ogly
  • Donkov P.V.
  • Medvedev N.Ja.
  • Nichegovskij V.A.
  • Solovykh V.I.
  • Spivak T.S.
  • Khan G.B.
  • Shcherbakov V.P.
RU2211311C2
METHOD TO INCREASE FORMATION HYDROCARBON YIELD AND INTENSIFY OIL-GAS-CONDENSATE PRODUCTION BY MEANS OF FORMATION RADIAL PENETRATION WITH HYDRAULIC MONITOR AT PRESSURE DRAWDOWN 2016
  • Popov Pavel Ivanovich
RU2632836C1
BOREHOLE PLANT FOR SIMULTANEOUS SEPARATE AND ALTERNATE OPERATION OF SEVERAL FORMATIONS BY SINGLE WELL 2003
  • Sharifov Makhir Zafar Ogly
  • Leonov V.A.
  • Uzhakov V.V.
  • Krasnoperov V.T.
  • Kuznetsov N.N.
  • Garipov O.M.
  • Gurbanov Sejfulla Ramiz Ogly
  • Nabiev Natig Adil Ogly
  • Nabiev Fizuli Ashraf Ogly
  • Sineva Ju.N.
  • Jusupov R.F.
RU2262586C2
METHOD FOR HYDRODYNAMIC TESTS OF EXPLOITATION WELL FORMATION (VERSIONS) 2015
  • Kazantsev Andrej Sergeevich
  • Skvortsov Dmitrij Evgenevich
  • Glebov Vadim Igorevich
RU2598256C1
METHOD OF DEVELOPMENT OF GAS-AND-OIL RESERVOIRS 2013
  • Timchuk Aleksandr Stanislavovich
  • Ivantsov Nikolaj Nikolaevich
RU2547530C1
OIL AND GAS DEPOSIT DEVELOPMENT METHOD 2001
  • Buslaev V.F.
  • Vdovenko V.L.
  • Nor A.V.
  • Judin V.M.
  • Pjatibrat V.P.
RU2260681C2
METHOD FOR OPERATION OF GUSHER WELLS WITH USE OF GAS-LIFT PHENOMENON OF ASSOCIATED OIL GAS 1997
  • Aminev Marat Khusnullovich
  • Poljakov Dmitrij Borisovich
  • Shajmardanov Ramil' Faritovich
RU2129208C1
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION 2013
  • Vasil'Ev Ivan Vladimirovich
  • Indrupskij Il'Ja Mikhajlovich
  • Zakirov Ehrnest Sumbatovich
  • Anikeev Daniil Pavlovich
RU2531414C1

RU 2 196 892 C2

Authors

Kelli Terri E.

Snajder Robert E.

Dates

2003-01-20Published

1997-12-01Filed