FIELD: mining.
SUBSTANCE: invention is related to mining and construction of underground structures, namely to method for fixation of acute-angled couplings of mine tunnels. Method for fixation of acute-angled coupling of horizontal and inclined mine tunnels with anchors includes the following stages: their fixation along perimetre with mine-run anchors in process of tunneling, installation of through horizontal anchors from root into adjacent mine with lag from the bottomhole of the latter, installation of deep anchors into wedge-like block between mines in zone of their considerable mutual effect from root mine in direction of adjacent one before start of adjacent mine tunneling.
EFFECT: preliminary strengthening of acute-angled block between branching mine tunnels, reduced hazard of shaft-sinking and tunneling works.
2 cl; 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SUPPORTING JUNCTIONS OF UNDERGROUND WORKINGS | 1996 |
|
RU2116454C1 |
METHOD FOR CONDUCTING MINING WORKS IN DEVELOPMENT OF FLAT COAL BEDS | 2022 |
|
RU2805691C1 |
METHOD OF SUPPORTING MINE WORKINGS JUNCTION | 2000 |
|
RU2193664C2 |
METHOD FOR REINFORCEMENT OF MINES SOIL | 2011 |
|
RU2468207C1 |
METHOD FOR SUPPORTING MINE WORKINGS WITH THERMAL STRENGTHENING OF UNSTABLE ROCKS | 2009 |
|
RU2405938C1 |
METHOD FOR REINFORCEMENT OF MINES | 2009 |
|
RU2400631C1 |
METHOD OF MINE WORKINGS SUPPORT | 2000 |
|
RU2177550C1 |
TIMBERING METHOD OF MINE OPENING | 2008 |
|
RU2371582C1 |
JUNCTION OF MINE WORKINGS | 0 |
|
SU1411484A1 |
METHOD OF ADVANCE MINE WALLING BY ANCHORS | 2013 |
|
RU2556749C2 |
Authors
Dates
2009-12-27—Published
2008-09-09—Filed