FIELD: oil-and-gas industry.
SUBSTANCE: according to method execute well killing, lifting to the surface a tubing string together with well equipment, examination of the tubing string, installation of two parkers on the TS, installing between which cementing by-pass sleeve. After the mentioned above assembly descending, fix the top parker at the level over the casing string detected leakage interval and fix the bottom parker at the level under the casing string detected leakage interval, then via the cementing by-pass sleeve, pump blocking composition into the hole clearance between two parkers, the blocking composition later pressed in to cavity behind the casing string and into the reservoir with a displacement liquid. Keep the blocking composition under pressure during hardening period, the transfer the well into production regime.
EFFECT: casing string leakage areas sealing reliability and quality increase also decrease well operation start-up time consumption.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
GAS AND GAS CONDENSATE WELLS WITH LEAKY CASING STRING REPAIR METHOD | 2008 |
|
RU2382171C1 |
PROCEDURE FOR REPAIR OPERATIONS IN WELL | 2009 |
|
RU2423599C2 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
METHOD OF WELL PROBLEM SECTIONS ELIMINATION | 2014 |
|
RU2555686C1 |
WATER AND GAS INFLUX LIMITING METHOD WITH WELL PRODUCTIVITY RECOVERY | 2013 |
|
RU2539047C1 |
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL | 2000 |
|
RU2183724C2 |
METHOD OF PRODUCTIVE STRATUM ISOLATION DURING CEMENTING CASING PIPE | 2001 |
|
RU2234593C2 |
PROCEDURE FOR DEVELOPMENT OF MULTI-PAY OIL DEPOSIT | 2010 |
|
RU2431747C1 |
METHOD FOR KILLING HORIZONTAL GAS WELLS | 2023 |
|
RU2813414C1 |
METHOD FOR COMPLEX PRODUCTION OF HYDROCARBONS FROM OIL AND GAS CONDENSATE WELLS AND A SYSTEM FOR ITS IMPLEMENTATION | 2020 |
|
RU2756650C1 |
Authors
Dates
2010-02-20—Published
2008-08-04—Filed