FIELD: engines and pumps.
SUBSTANCE: invention relates to electric power engineering and can be used at thermal electric power stations. Proposed gas-expansion machine comprises gas main pipeline, gas control station, turbo-expander, and turbo-expander feed and exhaust gas pipelines. Turbo-expander feed pipeline is connected to heated circuit of the first-stage intermediate air cooler arranged between low-pressure and medium-pressure compressors of gas-turbine unit three-stage compressor. Turbo-expander exhaust pipeline communicates with second-stage air cooler heated circuit arranged between medium- and high-pressure compressors of gas turbine unit three-stage turbo compressor.
EFFECT: higher efficiency.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPERATION OF EXPANDER-GENERATOR INSTALLATION OF ELECTRIC POWER PLANT | 2014 |
|
RU2582377C1 |
METHOD OF OPERATION OF STEAM-GAS PLANT OF POWER PLANT | 2020 |
|
RU2740670C1 |
GAS TURBINE EXPANDER POWER PLANT OF THERMAL POWER PLANT | 2018 |
|
RU2699445C1 |
METHOD OF OPERATING COMBINATION GAS-TURBINE SYSTEM OF GAS DISTRIBUTION AND APPARATUS FOR CARRYING OUT THE METHOD | 1992 |
|
RU2013616C1 |
METHOD OF OPERATION AND DESIGN OF INTERNAL COMBUSTION PISTON ENGINE WITH COMPLEX SYSTEM OF DEEP RECOVERY OF HEAT AND REDUCTION OF HARMFUL EMISSION | 2001 |
|
RU2232912C2 |
METHOD OF OPERATION AND DESIGN OF COMBINATION GAS TURBINE PLANT OF GAS DISTRIBUTING SYSTEM | 2000 |
|
RU2199020C2 |
GAS TURBINE EXPANSION POWER PLANT OF GAS-DISTRIBUTING STATION | 2013 |
|
RU2557834C2 |
METHOD OF OPERATION OF STEAM-GAS PLANT OF POWER PLANT | 2018 |
|
RU2693567C1 |
GAS DISTRIBUTION STATION POWER PLANT OR THE GAS CONTROL UNIT OPERATION METHOD | 2017 |
|
RU2650238C1 |
METHOD OF COMBINED GENERATING ELECTRIC POWER, HEAT AND COLD IN COMBINED-CYCLE PLANT WITH STEAM INJECTION AND COMBINED-CYCLE PLANT FOR ITS IMPLEMENTATION | 2013 |
|
RU2611921C2 |
Authors
Dates
2010-03-20—Published
2008-09-24—Filed