FIELD: oil-and-gas production.
SUBSTANCE: method includes downing into well of lifting pipe string for extraction of fluid from bottom and top stratums, connected to pipe hanger and exhaust lines, installation between stratums of parting packer, using of ejector pump ensured by ejection of which stratum fluid allowing of high pressure and productivity which is active medium, involves into action passive fluid from other stratum. Development of reserve is implemented in two stages, at the first stage - with usage of jet pump up to installation of mentioned difference of bottom-hole pressures, at the second stage jet pump is excluded from layout of downhole and control head equipment, and exhaust lines are connected to pipeline for transportation of fluids mixture. For method implementation it is used layout of downhole and control head. It contains columns of lifting pipes for extraction of fluids from top and bottom stratums, installed on pipe hanger of fountain installation parallel or concentric to each other, parting packer, installed in well between stratums, jet pump, connected to surface to fountain installation exhaust lines for passing of fluids from stratums and pipeline for transporting of fluids. On exhaust lines there are installed counters of accounting of each stratum. Exhaust lines are connected to jet pump, installed on surface after counters of accounting of productivity before pipeline for transportation of fluids mixture.
EFFECT: effectiveness increase of simultaneous separate operation of two stratums by one well.
2 cl, 1 tbl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM OF COLLECTION AND TRANSPORTATION OF OIL WELLS PRODUCTS | 2020 |
|
RU2743550C1 |
METHOD FOR SELECTIVE ANALYSIS OF SEPARATE FORMATIONS OF COAL-METHANOL WELLS | 2015 |
|
RU2578143C1 |
DEVELOPMENT OF MULTI-ZONE GAS FIELD | 2013 |
|
RU2536523C1 |
METHOD OF INCREASING PRODUCTIVITY OF DEVELOPMENT WELLS AND INJECTION CAPACITY OF INJECTION WELLS | 2016 |
|
RU2620099C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
METHOD OF BOREHOLE AND WELLHEAD EQUIPMENT LAYOUT FOR WELL SURVEY ENVISAGING INJECTION OF INJECTION FLUID TO FORMATION AND EXTRACTION OF FLUIDS FROM FORMATION | 2013 |
|
RU2531414C1 |
BOREHOLE PLANT FOR SIMULTANEOUS SEPARATE AND ALTERNATE OPERATION OF SEVERAL FORMATIONS BY SINGLE WELL | 2003 |
|
RU2262586C2 |
DEVELOPMENT METHOD OF OIL WELLS (VERSIONS), AND PLANT FOR ITS IMPLEMENTATION (VERSIONS) | 2010 |
|
RU2471065C2 |
METHOD FOR COMPLEX PRODUCTION OF HYDROCARBONS FROM OIL AND GAS CONDENSATE WELLS AND A SYSTEM FOR ITS IMPLEMENTATION | 2020 |
|
RU2756650C1 |
METHOD FOR PREVENTING DEPOSITS OF ASPHALT-RESINS AND PARAFFIN COMPONENTS OF OIL IN PUMP COMPRESSOR TUBES IN THE WELL AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2661951C1 |
Authors
Dates
2010-04-10—Published
2008-12-23—Filed