FIELD: oil-and-gas production.
SUBSTANCE: it includes selective flow opening of section with application of washer fluid, reaming of hole, sectional descent of overlapping devices in the form of shaped tubes by opening of stratum with expansion of overlapping devices hermetic lapped in the direction top-down without constriction of internal diametre. Before opening of all interval of complicated sections it is implemented its analysis and it is defined safe length of development range, outfitted from the bottom by profile section with diametre at extension exceeding diametre of extension of the rest profiled sections. Top end of the first section of profile overlapping devise is installed higher than complicated section, and the bottom end of the last section - lower than particular section.
EFFECT: it extends functional capabilities of profiled overlapping device, it provides alignment of connected overlapping per one round-trip operation of sections of overlapping devices, increasing safety of opening of range ensured by selection of length selective flow opening, and also reduces loading at beading of connection ensured by specific implementation of profiled sections at the bottom end of overlapping sections.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR SELECTIVE FLOW OPENING OF OVERLAPPING OF TROUBLESOME ZONE DURING DRILLING OF WELL | 2009 |
|
RU2386782C1 |
METHOD OF SEALING WALLS OF WELLS | 2007 |
|
RU2363832C1 |
METHOD OF PRESSURISATION OF WELL WALLS | 2007 |
|
RU2353752C1 |
DEVICE FOR INTERVAL COVERING OF TROUBLE ZONES AT WELL DRILLING | 2010 |
|
RU2439283C1 |
METHOD OF REINFORCEMENT OF WELL TROUBLESOME ZONE USING SHAPED SHUTTER | 2014 |
|
RU2548269C1 |
METHOD AND DEVICE FOR SUPPORTING INCOMPETENT ROCKS AT EXTENDED AREAS OF WELL BORES | 2011 |
|
RU2459927C1 |
METHOD FOR ISOLATION OF LEAKAGE INTERVAL OF PRODUCTION STRING OF WELL WITH EXPANDABLE FLY | 2023 |
|
RU2824451C1 |
METHOD FOR CONSTRUCTION OF MULTI-BARREL WELL AND GUIDE DEVICE FOR INSTALLATION OF CASING STRING IN ITS ADDITIONAL SHAFT | 2018 |
|
RU2695911C1 |
DRILLING METHOD OF ADDITIONAL BORE FROM PRODUCTION STRING OF WELL | 2008 |
|
RU2365728C1 |
METHOD AND ARRANGEMENT OF INSULATION FOR BOREHOLE TROUBLE ZONE USING PROFILED SHUTTER WITH CYLINDRICAL AREAS | 2008 |
|
RU2374424C1 |
Authors
Dates
2010-04-20—Published
2009-02-03—Filed