FIELD: construction.
SUBSTANCE: invention relates to construction, namely to methods for erection of supports and to designs of supports for construction of fences, for installation of overhead pipelines, for instance gas lines. Method for installation of support in well, characterised by the fact that reinforcement is installed in well, hardening material is laid, metal pipe is deepened into hardening material, at the same time upper end of reinforcement is arranged inside metal pipe. Support is also described, which is installed in well by above-described method.
EFFECT: increased manufacturability in production of support in well and reduced consumption of material, from which overhead part of support is made.
10 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MOUNTING POST INTO SOIL AND POST MOUNTED IN SOIL | 2014 |
|
RU2586338C2 |
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA | 2023 |
|
RU2809049C1 |
METHOD OF ERECTING PILES IN SUBSIDED OR SWELLING GROUNDS | 0 |
|
SU857349A1 |
METAL SUPPORT AND ITS ERECTION METHOD | 2013 |
|
RU2543397C1 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
METHOD OF PROTECTION OF PILE FOUNDATION OF BEARING SUPPORT AGAINST SOIL FROST HEAVE FORCES | 2015 |
|
RU2573145C1 |
BRIDGE SUPPORT | 2000 |
|
RU2162911C1 |
WALL IN GROUND | 2003 |
|
RU2252986C1 |
METHOD OF CONSTRUCTION OF BUILDINGS | 2023 |
|
RU2812973C1 |
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
Authors
Dates
2010-06-10—Published
2008-09-08—Filed