FIELD: construction.
SUBSTANCE: invention relates to construction, specifically to mounting a post in soil and construction thereof. Method of mounting a post into soil, comprising forming a well soil excavation, installing reinforcement into well and filling well with a preliminary portion of hardening material, which is used as concrete, sinking post in reinforcement and pouring concrete into well. From bottom of well a recess is made in soil to form a broadening, post sunk inside reinforcement, for loose soil a shell is installed in well along diameter of well, and a long post is sunk to bottom of well.
EFFECT: technical result consists in improvement of carrying capacity, providing prevention of extrusion of post in heaving soil, lower material input.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
REINFORCED CONCRETE PILE WITH NON-TENSIONING FIXTURES | 2018 |
|
RU2686739C1 |
MANUFACTURING METHOD OF ASSEMBLY ATTACHING PILE TO AVAILABLE FOUNDATION AT ITS BEING REINFORCED (VERSIONS) | 2008 |
|
RU2385384C1 |
WOODEN PILE BASE WITH COATING FOR INSTALLATION IN HEAVING SOILS | 2023 |
|
RU2822185C1 |
POLE FOR OVERHEAD SYSTEM TO BE ERECTED IN HEAVING GROUND | 2006 |
|
RU2317375C2 |
CATENARY LINE SUPPORT ON SLOPE AND DECLIVITY ERECTED ON HEAVING SOILS | 2018 |
|
RU2697755C1 |
METHOD FOR MANUFACTURING METAL POST WITH RECTANGULAR CROSS-SECTION HAVING SPACER ANCHOR FOR A FENCE AND USE OF SUCH POST | 2020 |
|
RU2754402C1 |
EARTH PILE AND METHOD FOR MANUFACTURING EARTH PILES | 2021 |
|
RU2763656C1 |
ERECTION METHOD OF PIER FOUNDATION WITH EXPANDED BASE | 2014 |
|
RU2558869C1 |
METHOD FOR BUILDING SHALLOW FOUNDATION POST HAVING CAMOUFLET WIDENED PART | 2003 |
|
RU2244780C1 |
Authors
Dates
2016-06-10—Published
2014-10-08—Filed