FIELD: construction.
SUBSTANCE: method is carried out with the help of replacement of concrete damaged under action of alternating freezing and thawing by more frost-resistant concrete. Repair works are carried out so that thickness of new frost resistant concrete layer is equal or more than depth of concrete frost penetration in this zone under conditions of repaired structure operation.
EFFECT: high durability of contact zone and repaired section of concrete or reinforced concrete structure as a whole.
5 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REPAIR OF HYDRAULIC STRUCTURES AND STRUCTURES IN THE ZONE OF VARIABLE WATER HORIZON | 2021 |
|
RU2766349C1 |
METHOD FOR RECOVERY AND BUILDING-UP OF PROTECTIVE LAYER OF CONCRETE ON VERTICAL SURFACES OF REINFORCED-CONCRETE CONSTRUCTIONS | 2000 |
|
RU2183713C2 |
METHOD FOR RECONSTRUCTION OF EXPANSION JOINTS OF PREFABRICATED ANTI-FILTRATION CONCRETE AND REINFORCED CONCRETE CLADDINGS OF HYDRAULIC STRUCTURES | 2016 |
|
RU2654084C1 |
TURBINE WATER CONVEYANCE STRUCTURE | 2004 |
|
RU2275463C2 |
HYDRAULIC STRUCTURE JOINT SEALING DEVICE | 2005 |
|
RU2281996C1 |
CONCRETE DAM | 0 |
|
SU1687706A1 |
METHOD FOR REPAIRING REINFORCED CONCRETE FOUNDATIONS OF POWER LINE SUPPORTS | 2006 |
|
RU2305731C1 |
SUPPORT OF CONTACT NETWORK ERECTED ON SWELLING SOILS | 2002 |
|
RU2209270C1 |
SUPPORT OF CONTACT NETWORK ERECTED ON SWELLING SOILS | 2002 |
|
RU2209269C1 |
METHOD FOR CREATING JOINT SEAL FOR TEMPERATURE AND TEMPERATURE-SEDIMENTATION OF HYDRAULIC STRUCTURE | 2023 |
|
RU2814951C1 |
Authors
Dates
2010-06-20—Published
2008-10-13—Filed