FIELD: construction.
SUBSTANCE: installation method of pile of open profile in weak seasonally frozen heaving soils provides for equipping some part of length of the pile shaft with the shell of closed transverse profile, which is arranged on some part of length of shaft, which is buried below the limit of seasonally frozen soil. Length of shell is determined based on optimum conditions of forming the compacted soil plug in semi-closed space of cavity of shell in direction of action of submerging force on the basis of the ratio: L = B/2tg(φ/2), where L - length of shell; B - width (cross dimension) of shell; φ - angle of internal friction of soil at the boundary of seasonal frost.
EFFECT: increase of pile bearing capacity.
Title | Year | Author | Number |
---|---|---|---|
METHOD TO CONTROL NORMAL HEAVING FORCE ACTING IN DIRECTION OPPOSITE TO TANGENT HEAVING FORCE ACTION | 2006 |
|
RU2318097C1 |
METHOD FOR CONSTRUCTION OF ANCHOR PILES | 1996 |
|
RU2114250C1 |
PILE FOUNDATION BUILT ON HEAVING FOUNDATION SOIL | 2004 |
|
RU2260094C1 |
METHOD FOR REDUCTION OF ACTION OF FORCES OF FROST BOIL AND INCREASING STABILITY OF PILE FOUNDATIONS IN PERMAFROST ZONE | 2015 |
|
RU2602538C1 |
METHOD TO ERECT PILE IN SEASONALLY FREEZING HEAVING SOILS | 2011 |
|
RU2474652C1 |
METHOD OF TREATING WOODEN PILE BASE WITH ANTI-HEAVING COATING | 2023 |
|
RU2826072C1 |
WOODEN PILE BASE WITH COATING FOR INSTALLATION IN HEAVING SOILS | 2023 |
|
RU2822185C1 |
METHOD OF PILE FOUNDATION PROTECTION FROM FREEZING HEAVING | 2002 |
|
RU2230854C1 |
POLE FOR OVERHEAD SYSTEM TO BE ERECTED IN HEAVING GROUND | 2006 |
|
RU2317375C2 |
METHOD FOR CONSOLIDATION OF PILE FOUNDATION FOR SUPPORT OF ELECTRIC POWER LINE | 1996 |
|
RU2117103C1 |
Authors
Dates
2010-07-10—Published
2008-06-20—Filed