FIELD: metallurgy.
SUBSTANCE: invention refers to protection of materials from corrosion, sedimentations and wear. The facility consists of external gas-proof wall and internal ceramic gas-proof wall arranged with a gap between them. The internal ceramic gas-proof wall is made out of porous material wherein dimension of pores diminishes to surface in thickness of wall. Surface of this wall contacts flowing medium. Also permeability decreases along length of the wall from the inlet of the facility to its outlet, thus compensating drop of pressure of corrosive and/or abrasive medium.
EFFECT: protection of internal surface of facility walls from corrosive and/or abrasive medium.
6 cl, 7 ex
Title | Year | Author | Number |
---|---|---|---|
FACILITY FOR SUPPLY OF CORROSIVE AND/OR ABRASIVE MEDIUM | 2008 |
|
RU2395625C2 |
MELTING METHOD OF HIGHLY PURITY MATERIALS IN TWO-LAYERED CONTAINER | 2008 |
|
RU2395333C2 |
MELTING METHOD OF HIGHLY PURITY MATERIALS IN TWO-LAYERED CONTAINER | 2008 |
|
RU2395334C2 |
PROCEDURE FOR PRODUCTION OF HIGH POROUS MATERIAL | 2008 |
|
RU2408741C2 |
METHOD FOR PRODUCTION OF HIGHLY POROUS CELLULAR STRUCTURE FROM CERAMICS | 2007 |
|
RU2348487C2 |
METHOD TO PRODUCE HIGH-POROSITY POLYMER MATERIAL | 2008 |
|
RU2377335C1 |
METHOD OF HIGH-POROUS MATERIAL RECEIVING | 2007 |
|
RU2353474C2 |
UNIT TO DISPERSE GASES IN FLUID MEDIUM | 2008 |
|
RU2381825C1 |
METHOD OF SATURATING LIQUID WITH GAS | 2008 |
|
RU2382673C1 |
CERAMIC COMPOSITE MATERIAL AND METHOD FOR PRODUCTION THEREOF | 2012 |
|
RU2517146C2 |
Authors
Dates
2010-07-27—Published
2008-10-21—Filed