FIELD: construction.
SUBSTANCE: arch bridge comprises coastal supports, bridge span and pedestrian walkway fixed on it. Bridge span consists of arch span and two cantilever beams hingedly fixed on it along tangent. Arch span, pedestrian walkway and cantilever arches represent monolith structures made of glass and plastic shell with polyurethane foam filler. Glass and plastic shell of arch span and glass and plastic shell of its part in pedestrian walkway, as well as glass and plastic shell of cantilever parts and glass and plastic shell of their part of pedestrian walkway are arranged as a whole when manufactured. Arch span and cantilever beam in cross section have "П"-shaped profile that represents monolithic structure of spaced power beams connected to each other by panel of pedestrian walkway and combined by a single shell. Spaced power beams and panel of pedestrian walkway are additionally connected to each other by transverse glass and plastic diaphragms. Upper part of bridge is equipped with barrier railings.
EFFECT: development of high-technology and light structure, which requires minimum time for installation, and having prolonged maintenance-free operation period.
8 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TRANSFER OF LONG-SPAN STEAM-AND-WATER MIXTURE DELIVERY PIPELINE OVER CANYON LOCATED IN SEISMICALLY ACTIVE ZONE | 2023 |
|
RU2815705C1 |
METHOD FOR RECONSTRUCTION OF OVERPASS WITH DISPLACEMENT OF RECONSTRUCTED RAILWAY BRIDGE AFLOAT | 1999 |
|
RU2152477C1 |
METHOD OF RECONSTRUCTION OF BRIDGEWORK WITH DISPLACEMENT OF RAILWAY BRIDGE FRAMEWORK AFLOAT AND ERECTION OF PEDESTRIAN BRIDGE | 2000 |
|
RU2198978C2 |
METHOD FOR ERECTION OF PEDESTRIAN OVERPASS | 1999 |
|
RU2152475C1 |
METHOD TO ASSEMBLE INVENTORY LOW-WATER BRIDGE ON SCREW PILES BY SPAN LAUNCHING | 2010 |
|
RU2446246C2 |
SPAN WITH BRIDGE FLOORING MADE OF PULTRUSION PROFILE | 2019 |
|
RU2735317C1 |
BUILT-UP BRIDGE BEAM AND BRIDGE ROAD | 1995 |
|
RU2100523C1 |
COLLAPSIBLE UNIVERSAL BRIDGE | 2014 |
|
RU2578231C1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136803C1 |
ARCH BRIDGE | 2001 |
|
RU2209868C2 |
Authors
Dates
2010-11-10—Published
2009-06-16—Filed