FIELD: heating.
SUBSTANCE: installation for drying of gas line comprises vacuum pump, main pipeline connecting suction nozzle of vacuum pump with discharge of steam and gas mixture from disconnected and sealed section of gas line, and cooler installed on line that transports steam and gas mixture and arranged in the form of direct contact device or surface heat exchanger. Installation is equipped with device for cold water production comprising refrigerating device with evaporator and condenser, and water-transporting lines that accordingly connect outlet of evaporator cold water to inlet of cooler cold water, and outlet of heated cooler water to inlet of heated evaporator water. Besides the latter of specified water-transporting lines is equipped with nozzle for condensate drain.
EFFECT: less time required for drying of disconnected section of manifold gas line, reduced capital and operational costs.
7 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
GAS PIPE DRYING DEVICE | 2007 |
|
RU2350860C1 |
DEVICE FOR GAS REMOVAL FROM CISTERNS | 2007 |
|
RU2366520C2 |
METHOD OF REPAIR OF MAIN GAS PIPELINE AND MOBILE GAS PUMPING UNIT FOR ITS IMPLEMENTATION | 2014 |
|
RU2567413C2 |
MOBILE INSTALLATION FOR GAS EXHAUST | 2008 |
|
RU2351806C1 |
APPARATUS FOR FRESHENING OF SEA WATER | 2005 |
|
RU2296107C1 |
METHOD OF PNEUMATIC TESTING DISCONNECTED SECTION OF MAIN GASLINE AND DEVICE THEREFOR | 2017 |
|
RU2669987C1 |
SOLUTION EVAPORATION PLANT | 2009 |
|
RU2394622C1 |
AUTOMOBILE GAS-FILLING COMPRESSOR STATION | 2001 |
|
RU2187038C1 |
METHOD FOR PUMPING GAS FROM DISCONNECTED SECTION OF GAS MAIN PIPELINE TO OPERATING SECTION THEREOF AND SYSTEM THEREFOR | 2014 |
|
RU2583203C1 |
METHOD AND SYSTEM OF COLLECTION, PREPARATION OF LOW-HEAD GAS-CARBON METHANE AND USE OF THERMAL POTENTIAL OF FORMATION FLUID (VERSIONS) | 2010 |
|
RU2422630C1 |
Authors
Dates
2010-11-10—Published
2009-06-11—Filed