FIELD: construction.
SUBSTANCE: method for erection of structures with application of plastic, porcelain, faience, wood, cardboard, paper, extracted from mechanisedly sorted domestic and industrial wastes, consists in assembly of reinforcement frame, manufacturing of curb, preparation of concrete mixture, filling of curb with concrete mix, further shift of curb for pouring of another layer and repeating of described operations until concrete frame of structure is completed with further performance of plastering and tiling works.
EFFECT: improved manufacturability and efficiency in process of finishing works performance during construction and in cosmetic routine repairs.
Authors
Dates
2010-11-27—Published
2009-05-12—Filed