FIELD: construction.
SUBSTANCE: invention relates to construction, in particular, to construction and operation of structures, having architecture of various heights. Method to prevent uneven subsidence of unevenly loaded foundations includes survey of soil, reinforcement of soil base in compliance with the data produced as a result of soil survey, and erection of foundation. Soil is surveyed under least loaded section of foundation. Then foundation is erected, and most loaded sections of soil base are reinforced by method of high-pressure injection proportionally to ratio of operational pressure of most loaded section to operational pressure of least loaded section.
EFFECT: provides for even subsidence of structure at various pressure of separate sections of foundations at soil by increasing stiffness of each section of base.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO CORRECT IRREGULARITIES OF BUILDINGS AND STRUCTURES SUBSIDENCE ON SLAB FOUNDATION | 2011 |
|
RU2468152C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
METHOD FOR FOUNDATION ENHANCING | 2015 |
|
RU2596621C1 |
METHOD OF FLOATING PILE LOAD-BEARING CAPACITY INCREASE | 2004 |
|
RU2275470C1 |
METHOD FOR MAKING OF IMPERVIOUS SCREEN | 2010 |
|
RU2447228C1 |
METHOD FOR BUILDING STRUCTURES | 1992 |
|
RU2035548C1 |
METHOD TO INCREASE LOAD-BEARING CAPACITY OF STRIP FOUNDATIONS AND BEARING POSTS | 2004 |
|
RU2272868C1 |
PILE-SLAB FOUNDATION AND METHOD OF ITS CONSTRUCTION | 2000 |
|
RU2163281C1 |
METHOD TO INCREASE BEARING CAPACITY OF BORED PILE | 2012 |
|
RU2509842C2 |
METHOD FOR REINFORCEMENT OF PILE FOUNDATION | 2019 |
|
RU2728052C1 |
Authors
Dates
2011-01-27—Published
2009-11-03—Filed