FIELD: construction.
SUBSTANCE: in method to excavate foundation pit when doing emergency works at subsurface structures including reinforcement of gap slopes, expanding, reinforcing and hardening material is injected into gap in unstable zone until complete filling of gap, and reinforced area is shaped in unstable zone by curing until full hardening of specified material, then soil is cut in layers, and a layer of expanded, reinforcing and hardened material is cut down to subsurface structure.
EFFECT: simplified technology of foundation pit slopes reinforcement and reduced time for its performance.
2 cl, 1 ex, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR STRENGTHENING OF SLOPES AND SLOT MAKER FOR ITS REALISATION | 2008 |
|
RU2371547C1 |
METHOD FOR STRENGTHENING STRUCTURALLY UNSTABLE SOILS WITH KARST FORMATIONS AND/OR WATER-SATURATED SOILS USING MICROPILES AND INJECTORS FOR FORMING MICROPILES | 2022 |
|
RU2795924C2 |
METHOD OF SOIL REINFORCEMENT | 2010 |
|
RU2439246C1 |
ERECTION OF TUNNELS IN STRUCTURALLY UNSTABLE SOILS WITH KARST PHENOMENA AND/OR BOIL PROCESSES | 2013 |
|
RU2537711C1 |
REINFORCEMENT METHOD OF FOUNDATIONS OF BUILDINGS ON STRUCTURALLY UNSTABLE SOILS AND SOILS WITH KARST FORMATIONS | 2013 |
|
RU2537448C1 |
METHOD OF CONSTRUCTING SINKABLE LINING IN THIXOTROPIC JACKET | 0 |
|
SU1364730A1 |
METHOD OF PROTECTION OF KARST OCCURRENCE | 2013 |
|
RU2543162C1 |
PROCESS OF ERECTION OF UNDERGROUND STRUCTURE | 2001 |
|
RU2198263C1 |
GROUND SLOPE OR HILLSIDE CONSOLIDATION METHOD | 2007 |
|
RU2345194C1 |
METHOD OF TUNNEL CONSTRUCTION | 2001 |
|
RU2181414C1 |
Authors
Dates
2011-03-20—Published
2009-10-26—Filed