FIELD: mining.
SUBSTANCE: first bottom is divided as to width into two parts. Drain is performed on one part. At that, river bank is protected by means of a berm against washway. Extraction of aggradational deposits is performed in opposite part of the first bottom. Works are carried out in two stages without violation of boundaries of coastal zone and safety berms during the pre-freshet period: mined rock is extracted at the first stage parallel to water drain; at the second stage, by means of inclined working (trench) at an angle close to 90° there knocked down is water drain and worked-out area of open-pit mine, water drain is shutoff downstream, and during the freshet period there performed is controlled aggradation of burdens of river drift to the worked-out area of open-pit mine.
EFFECT: enlarging production volumes on restricted surface areas without violation of boundaries of coastal zone owing to regeneration and recovery of stock.
1 ex, 1 tbl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO PRODUCE INERT MATERIALS | 2010 |
|
RU2476673C2 |
HYDRO-SYSTEM FOR PROTECTION AGAINST MUDFLOW | 2003 |
|
RU2232225C1 |
METHOD OF PREVENTING DAMAGE FROM FLOODING | 2019 |
|
RU2710164C1 |
FLOOD-PLAIN SLUDGE POND FOR INDUSTRIAL WASTE | 2004 |
|
RU2275457C2 |
METHOD FOR OPEN EXTRACTION OF MINERAL RESOURCE DEPOSITS | 2004 |
|
RU2256075C1 |
PROCESS PREVENTING FLOODING OF ARABLE LAND BY FLOODWATER OF MOUNTAIN RIVER | 2002 |
|
RU2228996C1 |
METHOD FOR PROTECTION OF COASTAL LANDSCAPE OF RIVERS AGAINST UNDERFLOODING | 2014 |
|
RU2552949C1 |
METHOD FOR ERECTION OF HYDRAULIC FILL DAM ON WATER-PERMEABLE FOUNDATION | 2008 |
|
RU2368728C1 |
METHOD OF TAILING DUMP IN MOUNTAIN TRENCHES RECULTIVATION | 2015 |
|
RU2611075C1 |
METHOD FOR REGULATING WATER FLOW IN RIVER CHANNELS FOR PREVENTING FLOODS | 2017 |
|
RU2683224C1 |
Authors
Dates
2011-03-27—Published
2009-07-16—Filed