FIELD: machine building.
SUBSTANCE: heating is performed under conditions, when boiler-house operates under mode of hot water supply and there are made two additional mains for supply of heating water to these objects. The boiler and circulation pump are stopped. Water is drained from section of the additional main to improve metal heating during weld. Fabricated sections of the main are welded before the gate of the direct main and after the gate on the return main. There is opened the gate on the additional main, after the gate on the return main there is opened the gate on the additional main before the gate on the direct main.
EFFECT: reduced consumption of gaseous fuel and electric power, improved operation of swimming pools, baths, saunas, drying rooms, dry cleaners at termination of central heating.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO MAKE-UP HEATING SYSTEM WITH HOT WATER, PREVENTING HYDRAULIC SHOCKS | 2010 |
|
RU2452897C2 |
METHOD OF RECORDING GAS FUEL CONSUMPTION IN ITS MAXIMUM USE BY BOILER UNIT | 2010 |
|
RU2445580C1 |
METHOD FOR ENLARGING HEATING SURFACE OF BOILER PLANT BY CHANGING WATER WALL SECTION DESIGN | 2011 |
|
RU2468290C1 |
DEVICE FOR ENLARGING ACTION TIME OF COMBUSTION PRODUCTS ON HEATING SURFACE OF BOILER PLANT | 2010 |
|
RU2421672C1 |
HEAT SUPPLY SYSTEM AND ITS OPERATION ARRANGEMENT METHOD | 2010 |
|
RU2434144C1 |
INDEPENDENT WATER SUPPLY SYSTEM | 2008 |
|
RU2374563C1 |
CENTRALIZED HEAT SUPPLY SYSTEM | 2000 |
|
RU2163703C1 |
INDEPENDENT HEAT AND COLD SUPPLY SYSTEM OF BUILDINGS | 2008 |
|
RU2382281C1 |
METHOD OF CENTRALIZED HEAT SUPPLY | 2000 |
|
RU2163327C1 |
HEAT SUPPLY SYSTEM | 1993 |
|
RU2095581C1 |
Authors
Dates
2011-04-10—Published
2009-12-07—Filed