FIELD: construction.
SUBSTANCE: invention relates to operation of water treatment facilities and underground premises (antechambers) of coastal pump houses (CPH), nuclear (NPP), thermal (TPP) and hydraulic (HPP) power plants. The proposed method to create a watertight coupling of a pipeline 1 with a barrier concrete or reinforced concrete wall 2 includes serial application of protective mix layers onto cleaned dry surfaces of the pipeline 1 and a cartridge 3, and closing of coupling unit ends. For this purpose an adhesive layer is applied onto an outer surface of the pipeline 1 and an inner surface of the cartridge 3 in the coupling area. Then insulation is provided at the side of the ends with a cement-sand mortar 5, as well as simultaneous closing of a control 4 and an injection 6 tubes. After hardening of the cement-sand layer, a hydraulic insulation mortar is injected into an insulated area 7 of coupling via an injection tube 6 bottom-up, with thixotropic properties, as a result of which cracks and cavities are mudded in process of filling and operation of a pipeline.
EFFECT: method makes it possible to increase reliability of a coupling unit operation for water impermeability, to increase operation time and to simplify technology in production of works, when creating and repairing water-impermeable couplings of pipelines with concrete or reinforced concrete walls.
Title | Year | Author | Number |
---|---|---|---|
MULTI-LAYER HYDRAULIC INSULATION OF UNDERGROUND STRUCTURE (DEVICE BY P.B. YURKEVICH) | 2013 |
|
RU2539456C2 |
METHOD FOR CREATING WATER-PROOFING COATING ON CONCRETE SURFACES | 1995 |
|
RU2083773C1 |
METHOD OF ERECTION OF SLAB REINFORCED CONCRETE FOUNDATION | 2018 |
|
RU2692396C1 |
METHOD OF SEALING OF UTILITY PENETRATIONS | 2016 |
|
RU2662822C2 |
LIQUEFIED NATURAL GAS UNDERGROUND STORAGE (LNG US) | 2011 |
|
RU2468282C1 |
METHOD OF INJECTION ANCHORING OF THE BOULDER-PEBBLE SOIL WITH UNFILLED VOIDS AND HIGH SPEEDS OF FILTRATION FLOW IN THEM | 2018 |
|
RU2680625C1 |
METHOD FOR DAMP-PROOFING OF BELOW-GRADE BUILDING | 2006 |
|
RU2333321C1 |
UNDERGROUND FACILITY LINING | 2010 |
|
RU2457332C1 |
METHOD FOR ELIMINATION OF WATER LEAKS IN UNDERGROUND ENGINEERING FACILITIES | 2015 |
|
RU2602537C1 |
METHOD TO SEAL DAMAGES IN HYDRAULIC ENGINEERING STRUCTURES UNDER WATER SURFACE | 2011 |
|
RU2486308C1 |
Authors
Dates
2011-07-10—Published
2010-03-23—Filed