FIELD: construction.
SUBSTANCE: first damages are sealed in hydraulic engineering under water surface by isolation of a damaged section in a hydraulic engineering structure from water access. Sealing is carried out using a sealing cement and sand mortar. The mortar is loaded into elastic water impermeable reservoirs, isolating from access of water and air. Reservoirs are laid from a barge with a grab to the damaged section of the hydraulic engineering structure. Further reservoirs are compacted with the grab grip until complete filling of the damaged section.
EFFECT: reduced cost of works performance, reduced labour intensiveness and higher efficiency.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECONSTRUCTION OF EXPANSION JOINTS OF PREFABRICATED ANTI-FILTRATION CONCRETE AND REINFORCED CONCRETE CLADDINGS OF HYDRAULIC STRUCTURES | 2016 |
|
RU2654084C1 |
REPAIR METHOD FOR UNDERGROUND PART OF HYDRAULIC STRUCTURE | 2003 |
|
RU2252292C2 |
METHOD FOR SEALING FUNCTIONAL JOINTS OF HYDRAULIC STRUCTURES, FUNCTIONAL JOINTS (VARIANTS) AND GLUE COMPOSITION FOR SEALING THEREOF | 2003 |
|
RU2234567C1 |
METHOD FOR CONSTRUCTION OF A NAVAL BASE ON AN OPEN WATER | 2022 |
|
RU2797792C1 |
DEVICE FOR CONDUCTING REPAIR WORKS AT HYDROTECHNICAL STRUCTURE | 2016 |
|
RU2633548C1 |
METHOD FOR MANUFACTURING SLAB OF QUAY SUPERSTRUCTURE | 2020 |
|
RU2746894C1 |
CLOSURE GATE | 0 |
|
SU1015032A1 |
PROTECTIVE HYDRAULIC STRUCTURE | 2005 |
|
RU2291931C1 |
METHOD TO CONSTRUCT AND REPAIR WATER CONDUITS AND HEADERS OF SHALLOW WASTE WATER ON BOTTOM OF RIVERS AND WATER RESERVOIRS | 2011 |
|
RU2465408C1 |
DEVICE FOR PERFORMING WORK ON UNDERWATER PARTS OF HYDRAULIC ENGINEERING STRUCTURES | 1998 |
|
RU2136813C1 |
Authors
Dates
2013-06-27—Published
2011-12-22—Filed