FIELD: oil and gas production.
SUBSTANCE: procedure for repair-isolation operations in well consists in pumping grouting mortar into isolated interval. Grouting mortar contains semi-hydrate of calcium and oil at ratio of weight parts 2:1. Further, there is pumped cleaning fluid corresponding to 0.05-0.2% of water solution of non-ionogenic surface active substance. Also, grouting mortar and cleaning fluid are pumped in equal by volume portions. The invention is developed in dependent points of formula.
EFFECT: raised efficiency of repair-isolating operations in well.
3 cl, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DOING REPAIR-ISOLATION WORKS UNDER CONDITIONS OF INTENSE ABSORPTION | 2009 |
|
RU2405926C1 |
METHOD OF RESTRICTING WATER PRODUCTION INTO OIL PRODUCING WELL | 2008 |
|
RU2370629C1 |
METHOD FOR ISOLATION OF BOTTOM WATER INFLOW IN OIL WELLS | 2015 |
|
RU2588582C1 |
METHOD FOR WATERPROOFING WORK IN FRACTURED MANIFOLDS | 2012 |
|
RU2496970C1 |
METHOD FOR LIMITING INFLUX OF WATER INTO PRODUCTION WELL | 2009 |
|
RU2392419C1 |
PROCEDURE FOR INSULATION OF WATER PRODUCTION IN WELL | 2010 |
|
RU2419714C1 |
METHOD OF REPAIR AND INSULATION OPERATIONS IN A WELL | 2016 |
|
RU2618539C1 |
METHOD OF REPAIR AND INSULATION WORKS IN WELL | 2015 |
|
RU2610963C1 |
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL | 2019 |
|
RU2723416C1 |
METHOD OF WATER SUPPRESSION IN HORIZONTAL WELL WITH WATERED CARBONATE BASINS | 2013 |
|
RU2519138C1 |
Authors
Dates
2011-07-20—Published
2010-02-19—Filed