FIELD: construction.
SUBSTANCE: method of ice crust formation includes development of a dam across a river and arrangement of ice holes above the dam along the river flow. The dam is made in a narrow area of the river with erosion-resistant shores by means of stakes driving-in across the river channel. In winter an ice hole is arranged, and straw, ice pieces, stones wrapped into polyethylene film are laid under ice to create a dam. Arriving water floods shores and forms ice crust.
EFFECT: invention makes it possible to reduce material intensity and to simplify process of structure erection.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ICE MOUND FORMATION | 2006 |
|
RU2363809C2 |
TEMPORARY WATER ENCLOSING STRUCTURE MADE OF ICE AND SNOW | 2015 |
|
RU2590813C1 |
METHOD OF FORMING ICE DAM ON RIVER | 2003 |
|
RU2263181C2 |
METHOD OF ARTIFICIAL FORMATION OF ICE-CHEST ON MOUNTAIN RIVER | 2014 |
|
RU2552079C1 |
DAM | 0 |
|
SU1130651A1 |
METHOD FOR DESTRUCTION OF ICE COVER ON RIVERS | 2019 |
|
RU2730037C1 |
METHOD OF PROTECTION AGAINST MUD STREAMS | 2014 |
|
RU2550120C1 |
METHOD FOR PROTECTION OF TERRITORIES AGAINST FLOODING IN RIVER BASINS | 2006 |
|
RU2389845C2 |
METHOD OF CREATING ICE JAM | 0 |
|
SU1194964A1 |
METHOD OF CLUTIVATING GREENLAND ON BOTTOMS OF RECLAIMED THERMOKARST LAKE | 0 |
|
SU1166692A1 |
Authors
Dates
2011-07-27—Published
2010-02-18—Filed