FIELD: machine building.
SUBSTANCE: work piece is broached in cold condition with upper and lower deforming tools. Broaching is carried out in two stages. One of deforming tools initially performs progressive motion to the moment of rapid increase of deforming force and makes a bridge. Ratio of bridge thickness to diameter of the deforming tool is 1/3…1/4. Further, the same deforming tool performs progressive motion simultaneously with its rotation or with rotation of the second deforming tool. Deforming tools of various diameter are used for fabrication of parts with stepped internal surface.
EFFECT: reduced metal consumption for fabrication of bush.
4 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
HOLLOW PART PRESSING OUT METHOD | 2003 |
|
RU2254202C1 |
METHOD FOR MAKING PARTS SUCH AS SLEEVES HAVING THROUGH CAVITY AND OUTER SURFACE WITH AXIALLY VARIABLE CROSS SECTION | 2005 |
|
RU2308347C2 |
METHOD OF EXTRUSION PARTS SUCH AS GLASSES AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2602936C2 |
METHOD FOR MANUFACTURING HOLLOW ARTICLES | 0 |
|
SU1807914A3 |
METHOD OF MANUFACTURE OF SMALL ARMS CARTRIDGE CASES | 1996 |
|
RU2113309C1 |
METHOD OF GLASS-TYPE PARTS EXTRUSION AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2660472C1 |
METHOD FOR MAKING AXIALLY SYMMETRICAL PRODUCTS BY ROLLING OUT | 1995 |
|
RU2085321C1 |
METHOD OF MAKING ROLLERS OF HEAVY-DUTY DRIVE CHAINS | 2011 |
|
RU2478452C2 |
METHOD OF RING-SHAPED ITEMS PRESS MOULDING | 2007 |
|
RU2364464C2 |
HUB WITH FLANGE RESTORATION METHOD | 1997 |
|
RU2115532C1 |
Authors
Dates
2011-08-10—Published
2010-01-11—Filed