FIELD: oil and gas industry.
SUBSTANCE: well completion method includes drilling, casing and cementing of the vertical borehole up to production horizon, drilling of a horizontal shaft. Water-saturated areas are identified. The perforated liner with open perforated holes is placed in the horizontal shaft, in the farthest part from the mouth with a cementing unit and perforated holes closed by acid-soluble plugs in the middle part and the whole part located closer to the mouth. Casing space of the liner middle part is cemented through the cementing unit with cement lifting up to the end to the whole part located closer to the mouth. The process is withheld for the period of cement hardening. Hydrostatic level is reduced and influx of reservoir fluid is obtained from the interval of the liner part farthest from the mouth. When influx is low, it is intensified in non-cemented part of the liner with shutoff of the remaining part by the packer with feedthrough hole. The plugged packer is set. Hydrochloric acid treatment is made for the middle part of the liner till magnesium plugs and part of the cement in casing annulus are dissolved. The well is flushed and influx is intensified from the medium part of the liner.
EFFECT: increase of well productivity.
1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
PLUGS REMOVING METHOD FROM PERFORATED SHANK HOLES WHILE PUMPING HORIZONTAL WELL IN BITUMEN DEPOSIT | 2016 |
|
RU2626496C1 |
METHOD FOR DEVELOPMENT OF HIGH-PERMEABLE BED SATURATED WITH OIL AND UNDERLYING EARTHEN WATER | 2018 |
|
RU2705136C1 |
WELL COMPLETION METHOD | 2017 |
|
RU2645054C1 |
METHOD FOR DEVELOPMENT OF RESERVOIR NON-UNIFORM BY PERMEABILITY FROM ROOF TO SOLE, SATURATED WITH OIL AND UNDERLYING WATER | 2021 |
|
RU2778703C1 |
METHOD FOR CONSTRUCTING SIDETRACK WITH HORIZONTAL ENDING | 2014 |
|
RU2553732C1 |
COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT | 2022 |
|
RU2793351C1 |
METHOD FOR SELECTIVE ISOLATION OF PRODUCTIVE RESERVOIR AT CEMENTATION OF PRODUCTION STRING | 1993 |
|
RU2087674C1 |
CONSTRUCTION FINISHING METHOD FOR HORIZONTAL PRODUCER | 2012 |
|
RU2516062C1 |
METHOD FOR COMPLETING AND INTENSIFYING INFLOW OF WELL WITH CARBONATE RESERVOIRS | 2020 |
|
RU2750004C1 |
TECHNOLOGY FOR THE DEVELOPMENT OF A HIGHLY PERMEABLE RESERVOIR BED SATURATED WITH GAS AND UNDERLAIN BY RESERVOIR WATER | 2020 |
|
RU2762321C1 |
Authors
Dates
2014-09-10—Published
2013-09-24—Filed