FIELD: oil and gas industry.
SUBSTANCE: invention is related to oil industry and may find application in construction of wells. Provides for increased reliability of well annular space cementing. In process of well construction drilling, lowering of casing string equipped with devices for collar cementing in the form of rubber-fabric material collars faced upwards and cementing of annular space of casing string. At least three devices of collar cementing are installed in well, the upper one - above payout oil beds under upper water-bearing beds, lower one - under payout oil beds above top of lower water-bearing beds, medium one - between payout beds, difference of bed pressures in which is at least 2 MPa. In case there are several beds or groups of beds are available with differences of bed pressures of more than 2 MPa, several devices of collar cementing are installed between every such beds or groups of beds.
EFFECT: increased reliability of well annular space cementing.
2 cl, 1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
CEMENTING METHOD OF WELL | 2020 |
|
RU2728170C1 |
METHOD FOR INTENSIFYING THE PRODUCTION OF RESERVOIR PRODUCTS WITH BOTTOM WATER (OPTIONS) | 2021 |
|
RU2769027C1 |
PROCEDURE FOR CONSTRUCTION OF WELLS OF MULTI-PAY OIL FIELD | 2010 |
|
RU2427703C1 |
METHOD OF GAS WELL COMPLETION | 2013 |
|
RU2534548C1 |
RESERVOIR SELECTIVE SEALING METHOD AT WELL CASING STRING FIRST STAGE CEMENTING | 2008 |
|
RU2379475C1 |
METHOD FOR SELECTIVE ISOLATION OF PRODUCTIVE RESERVOIR AT CEMENTATION OF PRODUCTION STRING | 1993 |
|
RU2087674C1 |
COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT | 2022 |
|
RU2793351C1 |
METHOD FOR KILLING WELL WITH FIBERGLASS CASING | 2023 |
|
RU2811127C1 |
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL | 2019 |
|
RU2708747C1 |
METHOD FOR CEMENTING FLOW STRING IN WELL | 0 |
|
SU1798483A1 |
Authors
Dates
2009-05-10—Published
2008-06-07—Filed