FIELD: machine building.
SUBSTANCE: procedure for control of technical state of mains inter-crossing (versions) refers to pipeline transport and can be used for control of technical state of mains inter-crossing. According to the first version there are measured values of stresses U1, U2 between ground and each main in a point of crossing. Further, there is determined modulus of difference lU1-U2I of measured values of stresses. A value of modulus of difference lU1-U2I is compared with a threshold value ε. When modulus of difference lU1-U2I exceeds threshold value ε, there is diagnosed hazardous state of main crossing. According to the second version of the procedure there are measured values of stresses lU1-U2I between ground and each main in a point of crossing and there is controlled measured values U1, U2 of stresses belonging to corresponding intervals of allowed values (UH1…UB1), (UH2…UB2). Also, in case, when at least one measured value of stresses U1 or U2 is beyond a corresponding allowed range there is diagnosed a hazardous state of main crossing.
EFFECT: elimination of main crossing hazardous state.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MAIN PIPELINE CROSSING STATE DIAGNOSTICS | 2009 |
|
RU2423643C2 |
PROCEDURE FOR CONTROL OF TECHNICAL STATE OF CROSSES IN MAINS AND SYSTEM FOR ITS IMPLEMENTATION | 2009 |
|
RU2413902C1 |
METHOD OF DIAGNOSING CROSSINGS OF MAIN PIPELINES STATE AND SYSTEM TO THIS END | 2009 |
|
RU2433332C2 |
METHOD OF MAIN PIPELINE STATE DIAGNOSTICS | 2009 |
|
RU2423644C2 |
PROCEDURE FOR MONITORING CORROSION OF MAIN WITH DEVICE OF CATHODE PROTECTION | 2010 |
|
RU2422717C1 |
METHOD TO CONTROL UNDERWATER MAIN PIPELINE SERVICEABILITY | 2009 |
|
RU2433334C2 |
METHOD FOR SYNCHRONISING TWO THREE-PHASE ELECTRIC ENERGY SYSTEMS | 2014 |
|
RU2566667C1 |
SYSTEM TO CONTROL MAIN PIPELINE STATE ON ROAD CROSSING | 2009 |
|
RU2433335C2 |
METHOD FOR REMOTE MONITORING TECHNICAL STATE OF MAIN PIPELINE AND SYSTEM FOR REALISING SAID METHOD | 2008 |
|
RU2392536C1 |
METHOD OF LOCATION AND ESTIMATION OF SIZE OF LEAKAGE IN UNDERGROUND PIPE LINE | 2001 |
|
RU2219430C2 |
Authors
Dates
2011-08-27—Published
2009-08-05—Filed