FIELD: machine building.
SUBSTANCE: procedure consists in recording concentration of gas-air mixture; when concentration approaches maximal allowed explosion hazardous levels there are generated sound and light signals. With 10-15 sec time delay supply of gas is turned off in a gas line and a room is ventilated during time: where Vvn is value of a ventilated room, m3, K is multiplicity of air exchange in a room per an hour (K≥5), Lv is efficiency of a fan of emergency ventilation, m3/h, Kn is correction coefficient for calculated volume of air. The device consists of a gas metre, of a communication line with sound and light signalisation, of an electric current source, and of a switch. Via the switch the current source is connected to an input of a starting relay and input of a step-down transformer. The transformer is connected with a gas sensor, amplifier and sound and light signalisation through a rectifier. Amplifier output is connected with an actuating mechanism of a handle of the gas cock. The handle interacts with the switch, an output of which is connected to the input of the fan of emergency ventilation.
EFFECT: raised reliability for prevention of explosion of gas-air mixture in explosion hazardous zones of premises.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
AUTOMATIC GAS-AIR EXPLOSION PREVENTION DEVICE | 2018 |
|
RU2702788C1 |
METHOD AND SYSTEM FOR AVOIDING EXPLOSION OF GAS-DRIVEN VEHICLE | 2013 |
|
RU2548102C1 |
ANTI-EMERGENCY SYSTEM FOR GASIFIED PREMISES AND WINDOW TRANSOM USED IN ANTI-EMERGENCY SYSTEM | 2022 |
|
RU2785365C1 |
GAS TURBINE PLANT PROTECTION SPECIAL ACS COMPLEX | 2012 |
|
RU2515581C2 |
DEVICE FOR PREVENTION OF EXPLOSION OF GAS ACCUMULATIONS | 1999 |
|
RU2155268C1 |
SYSTEM OF LOCALISED CONTROL OF COMBUSTIBLE GAS LEAKS BY PRIMARY PARAMETERS OF MEASURING DEVICES | 2013 |
|
RU2532232C1 |
SAFETY CONTROL IN REPAIR AT MAIN PIPELINES AND SYSTEM TO THIS END | 2011 |
|
RU2484361C1 |
METHOD FOR PRESERVATION OF EXPLOSION PROTECTION OF NON-EXPLOSION-PROOF GAS-TURBINE ENGINE WITH LEAKAGE OF FUEL GAS IN COMPARTMENT OF GAS-TURBINE INSTALLATION AND PROTECTIVE DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2789768C1 |
GAS LEAKAGE AUTOMATIC DETECTION AND CONTROL SYSTEM | 2017 |
|
RU2666324C2 |
METHOD OF MONITORING OF EMERGENCY GASSING OF SPACE AND DEVICE FOR ITS REALIZATION | 1996 |
|
RU2124745C1 |
Authors
Dates
2011-09-20—Published
2009-10-19—Filed