FIELD: mining.
SUBSTANCE: method involves the following stages: a) hydraulic interconnection between the well and at least one target area for processing in underground formation crossed with the well; b) arrangement in the well of tubing string; c) introduction to the well of treatment solution; d) contact of target zone in underground formation with treatment compound; e) introduction of deflecting agent through tubing string to the interval in the well; repetition of stages c) and d) for more than more target zone; at that, control of micro-seismic vibrations is performed at the treatment; and as per the above vibrations there determined are sizes of the treated zone or propagation of the treatment beyond the limits of the treated zone; on the basis of that, modes of introduction of treatment compound or its properties are changed or deflecting agent is introduced.
EFFECT: increasing the efficiency of the method and improving the system operating reliability.
52 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WELL TREATMENT OF (VERSIONS) | 2007 |
|
RU2587197C2 |
METHOD OF BOREHOLE CONDITIONING WITH COLLECTION OF PRODUCTIVE INTERVALS | 2007 |
|
RU2395667C1 |
MULTIZONE WELL COMPLETION METHOD AND SYSTEM (VARIANTS) | 2005 |
|
RU2310066C2 |
METHODS OF CONTROLLING OPERATION OF PERFORATORS SYSTEM IN BOREHOLE, UNDERGROUND BED FISSURING AND PROCESSING | 2009 |
|
RU2467160C2 |
FORMATION HYDRAULIC FRACTURING METHOD | 2007 |
|
RU2453693C2 |
OPERATIONS CARRIED OUT IN THE WELL-BORE SHAFT WITH THE USE OF THE MULTI-TUBULAR SYSTEM | 2014 |
|
RU2669419C2 |
COMPLETION ASSEMBLY AND METHOD FOR WELL COMPLETION IN UNDERGROUND FORMATION | 2008 |
|
RU2431036C2 |
HYDRAULIC STRATUM FRACTURE METHOD | 2007 |
|
RU2397319C2 |
SYSTEM AND METHOD FOR PERFORMING OPERATIONS FOR STIMULATION OF RESOURCES | 2013 |
|
RU2591857C1 |
METHOD FOR TREATMENT OF WELL BORE HAVING ANNULAR INSULATING SYSTEM | 2011 |
|
RU2530141C2 |
Authors
Dates
2011-10-10—Published
2007-06-26—Filed