METHOD AND SYSTEM FOR PROCESSING OF UNDERGROUND FORMATION WITH USE OF DEVIATION OF PROCESSING FLUID MEDIA (VERSIONS) Russian patent published in 2011 - IPC E21B43/14 E21B43/26 

Abstract RU 2431037 C2

FIELD: mining.

SUBSTANCE: method involves the following stages: a) hydraulic interconnection between the well and at least one target area for processing in underground formation crossed with the well; b) arrangement in the well of tubing string; c) introduction to the well of treatment solution; d) contact of target zone in underground formation with treatment compound; e) introduction of deflecting agent through tubing string to the interval in the well; repetition of stages c) and d) for more than more target zone; at that, control of micro-seismic vibrations is performed at the treatment; and as per the above vibrations there determined are sizes of the treated zone or propagation of the treatment beyond the limits of the treated zone; on the basis of that, modes of introduction of treatment compound or its properties are changed or deflecting agent is introduced.

EFFECT: increasing the efficiency of the method and improving the system operating reliability.

52 cl, 8 dwg

Similar patents RU2431037C2

Title Year Author Number
METHOD FOR WELL TREATMENT OF (VERSIONS) 2007
  • Klark V. E.
  • Bentli Dug
  • Deniels Dzhon
  • Fredd Kristofer N.
  • Miller Charlz
  • Lassek Dzhon
RU2587197C2
METHOD OF BOREHOLE CONDITIONING WITH COLLECTION OF PRODUCTIVE INTERVALS 2007
  • Ist Lojd Eh. Ml.
  • Kurvill' Perri Uehjn
  • Altman Richard A.
  • Klehjton Robert
RU2395667C1
MULTIZONE WELL COMPLETION METHOD AND SYSTEM (VARIANTS) 2005
  • Lopes De Kardenas Khorkhe
  • Ritlevski Gari L.
  • Khehkvort Mehtt'Ju R.
  • Uitsitt Dzhon R.
  • Garsia Khose F.
RU2310066C2
FORMATION HYDRAULIC FRACTURING METHOD 2007
  • Uilson Dennis Rehj
RU2453693C2
METHODS OF CONTROLLING OPERATION OF PERFORATORS SYSTEM IN BOREHOLE, UNDERGROUND BED FISSURING AND PROCESSING 2009
  • Makleod Trevor
  • Makhdi Abbas
RU2467160C2
OPERATIONS CARRIED OUT IN THE WELL-BORE SHAFT WITH THE USE OF THE MULTI-TUBULAR SYSTEM 2014
  • Parlin, Joseph, D.
RU2669419C2
HYDRAULIC STRATUM FRACTURE METHOD 2007
  • Dasterkhoft Dejl
  • Braun Dehvid
  • Vogan Dzhejson
  • Ljuk Sehm
  • Talissi Majkl
RU2397319C2
COMPLETION ASSEMBLY AND METHOD FOR WELL COMPLETION IN UNDERGROUND FORMATION 2008
  • Surdzhaatmadzha Dzhim B.
  • Khauehll Mehtt'Ju T.
RU2431036C2
SYSTEM AND METHOD FOR PERFORMING OPERATIONS FOR STIMULATION OF RESOURCES 2013
  • Kress Olga
  • Ven Syaovej
  • Gu Khunzhen
RU2591857C1
METHOD FOR TREATMENT OF WELL BORE HAVING ANNULAR INSULATING SYSTEM 2011
  • Gupta D.V. Sat'Janarajana
  • Olt Marshall Dzh.
  • Venugopal Rupa
RU2530141C2

RU 2 431 037 C2

Authors

Klark V. E.

Bentli Dug

Dehniels Dzhon

Fredd Kristofer N.

Miller Charl'Z

Lassek Dzhon

Dates

2011-10-10Published

2007-06-26Filed