FIELD: machine building.
SUBSTANCE: according to present method components of analysed group of threaded connections are determined by analysis of model. Further, the first group of threaded connections in an analysed group is subjected to physical tests. There is performed modelling analysis of the first and second groups of threaded connections. Physical tests are not carried out for the second group. After modelling results of a physical test and modelling analysis are compared to obtain a factor of working characteristic for the first group. Further, the factor of the working characteristic is applied for the second group and limits of functionality are determined on base of this factor of the working characteristic.
EFFECT: increased reliability of threaded connections.
18 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM AND METHOD FOR WELL PRODUCTION OPTIMISATION | 2008 |
|
RU2520187C2 |
THREADED CONNECTION OF OILFIELD CASING AND TUBING GOODS WITH HIGH RESISTANCE TO COMPRESSION AND COMBINED LOADS (OPTIONS) | 2017 |
|
RU2678785C1 |
CHANNEL AND IMMERSION TUBE FOR SENSOR ARRAY | 2018 |
|
RU2752852C2 |
STRUCTURE ASSESSMENT USING SPATIAL-FREQUENCY ANALYSIS | 2006 |
|
RU2423718C2 |
METHOD FOR CONNECTING CASING PIPES BY FIBER-OPTIC LASER WELDING WHEN PERFORMING TRIPPING OPERATIONS OF THE CASING STRING IN THE PROCESS OF DRILLING AND CASING WELLS | 2021 |
|
RU2772002C1 |
BOREHOLE MEASUREMENTS TO BE TAKEN DURING WELL OPERATIONS OTHER THAN DRILLING | 2004 |
|
RU2310748C2 |
FIRE HEAT GENERATOR, SYSTEM AND METHOD FOR INCREASING RESERVOIR RECOVERY | 2011 |
|
RU2586561C2 |
MANDREL WITH SIDE POCKET THAT MAINTAINS OPERATION CAPABILITY AFTER SUBJECTED TO FLUSH OF CEMENT SLURRY | 2003 |
|
RU2336409C2 |
WELL COMPLETION IN ONE PRODUCTION STRING RUNNING | 2003 |
|
RU2349735C2 |
STATOR COIL FASTENER SYSTEM FOR STATORS NOT COATED BY LACQUER | 2010 |
|
RU2525233C2 |
Authors
Dates
2011-10-27—Published
2006-11-20—Filed