FIELD: mining.
SUBSTANCE: invention can be used in designing and reclamation of shallow pits, mainly with low power of overburden rocks, including at production of building stone. During development of quarry field pit wall is formed outside contours of deposits, and rocks, taken when forming sides, are used for their flattening. Angle of inclination of pit sides is set based on equality of volumes of rocks, required for flattening of sides, and volume of rocks taken outside contours of deposits when forming sides.
EFFECT: reduced volume of soil in mining operations and complete usage of all hollow rocks for reclamation of mined space.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF QUARRIES RECLAMATION (VERSIONS) | 2010 |
|
RU2433268C1 |
METHOD TO MINE BED DEPOSITS | 2012 |
|
RU2490464C1 |
METHOD FOR RECLAMATION OF DISTURBED LANDS | 2008 |
|
RU2374447C1 |
METHOD OF PITS CONSERVATION WITH FLOODING OF SELECTED AREA | 2010 |
|
RU2451179C1 |
METHOD OF MECHANICAL AND HYDRAULIC RECULTIVATION OF LANDS | 2014 |
|
RU2569146C1 |
RECULTIVATION METHOD OF OPEN PITS USING INDUSTRIAL WASTES | 2011 |
|
RU2479721C1 |
RECLAMATION METHOD OF DISTURBED LANDS | 2018 |
|
RU2715768C2 |
PROCEDURE OF FORMING AND PREPARING OF EXTERNAL DUMPS AND BORROW CUTS FOR BIOLOGICAL RE-CULTIVATION | 2007 |
|
RU2359127C2 |
METHOD FOR WATERED MINERAL DEPOSITS DEVELOPMENT | 2020 |
|
RU2750445C1 |
METHOD FOR MINED LAND RECLAMATION | 2007 |
|
RU2325534C1 |
Authors
Dates
2016-08-10—Published
2015-06-18—Filed