FIELD: construction engineering; erection of pipe lines on slope of mountainous terrain. SUBSTANCE: pipe is transported by rail track laid in bottom of trench, joints of pipes are insulated by thermally shrinkable couplings and are protected by envelopes; part of pipe line thus prepared is placed on supports made from soil sacks, after which rail track is dismantled, percolation strips are fitted and trench is filled with ground soil. EFFECT: enhanced reliability.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LAYING UNDERGROUND PIPELINE IN SEISMIC ZONES | 2004 |
|
RU2250409C1 |
METHOD OF PIPE LAYING IN ROCK AND HALF-ROCK AT LONGITUDINAL SLOPES | 2012 |
|
RU2516984C1 |
METHOD AND DEVICE FOR LAYING UNDERGROUND PIPELINE | 2006 |
|
RU2322629C1 |
METHOD FOR ERECTION OF PIPELINE IN FROZEN AND WATERLOGGED SOIL | 2010 |
|
RU2452886C2 |
METHOD OF REINFORCEMENT OF LOOSE GROUNDS OF BASES AND SLOPES (VERSIONS) AND GEO-GRATE FOR REALIZATION OF THIS METHOD | 2003 |
|
RU2228479C1 |
METHOD OF PIPELINE REPAIR (VERSIONS) | 2004 |
|
RU2332610C2 |
METHOD OF CONSTRUCTION OF PIPELINE IN COMPLICATED NATURAL CONDITIONS | 1991 |
|
RU2028534C1 |
METHOD TO INSTALL UNDERGROUND PIPELINE | 2011 |
|
RU2455551C1 |
METHOD TO INSTALL PIPELINES IN SEISMIC REGIONS | 2010 |
|
RU2447348C2 |
ARTIFICAL TRENCH FOR MAIN PIPELINE, METHOD OF ITS BASE CONSTRUCTION (VERSIONS), BASE (VERSIONS), AND DEVICE FOR BASE CONSTRUCTION | 2007 |
|
RU2340824C1 |
Authors
Dates
2002-12-20—Published
2000-10-19—Filed