FIELD: construction.
SUBSTANCE: method for strengthening and bio-moisture protection of wooden piled foundations includes treatment of soils that are close to a pile cluster with a pressurised hydroactive polyurethane solution into a well located near the strengthened piles. Prior to supply of the hydroactive polyurethane, 10% solution of dimethyl phosphate is injected into the space around piles.
EFFECT: higher quality of strengthening and bio-moisture protection of wooden piled foundations.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INCREASING BEARING STRENGTH OF PILING | 2007 |
|
RU2379419C2 |
METHOD FOR PILE CONSTRUCTION IN MACRO-POROUS SOILS | 2020 |
|
RU2753295C1 |
METHOD TO ERECT PILE FOUNDATION | 2011 |
|
RU2456408C1 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
METHOD TO STRENGTHEN FOUNDATION BASES IN SEISMICALLY DANGEROUS AREAS | 2011 |
|
RU2487976C1 |
METHOD TO PREVENT UNEVEN SUBSIDENCE OF UNEVENLY LOADED FOUNDATIONS | 2009 |
|
RU2410493C1 |
METHOD FOR STRENGTHENING STRUCTURALLY UNSTABLE SOILS WITH KARST FORMATIONS AND/OR WATER-SATURATED SOILS USING MICROPILES AND INJECTORS FOR FORMING MICROPILES | 2022 |
|
RU2795924C2 |
METHOD OF ARRANGING INJECTION PILE | 2016 |
|
RU2637002C1 |
METHOD OF INJECTION PILE BUILDING | 2003 |
|
RU2238366C1 |
METHOD OF INSTALLATION OF PILES ON MACROPOROUS SOILS | 2022 |
|
RU2800801C1 |
Authors
Dates
2012-01-27—Published
2010-03-02—Filed