FIELD: mining engineering.
SUBSTANCE: invention belongs to the mining engineering, more specifically to the equipment for assessment of roof displacement within the preliminary development. Simple construction constitutes an important advantage. Equipment for assessment of roof displacement within the preliminary development consists of a fixed element with an elastic member located inside and moving armature with a fixed block. The fixed element is fixed to the tubular sprung structure, while the moving armature may be displaced against the fixed element for not less than 40 cm.
EFFECT: ability to make respective measurements without rendering difficulties to oil extraction.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REMOTE MEASUREMENT OF ROOF ROCKS DISPLACEMENT | 2010 |
|
RU2441159C2 |
METAL YIELDING FRAME SUPPORT FROM MINE SPECIAL CHANNELS TO SUPPORT MINE OPENING AT UNDERGROUND DEVELOPMENT OF MINERAL DEPOSITS | 2009 |
|
RU2429348C2 |
METHOD OF SUPPORT OF DEVELOPMENT WORKINGS | 1995 |
|
RU2079660C1 |
DEVICE FOR DETERMINING ROOF ROCK DEFORMATIONS | 2010 |
|
RU2425215C1 |
ROCK MASSIF MOVEMENT REGISTRATION MARK | 2004 |
|
RU2272134C1 |
REINFORCEMENT METHOD OF MINE WORKINGS WITH ANCHOR SUPPORT | 2010 |
|
RU2430237C1 |
0 |
|
SU152222A1 | |
ANCHOR | 0 |
|
SU1737130A1 |
EXTRACTED DEPTH REFERENCE BENCHMARK | 2016 |
|
RU2627503C1 |
METHOD OF REPAIRING MINE WORKING IN SALT DEPOSITS | 2009 |
|
RU2405111C1 |
Authors
Dates
2012-02-10—Published
2010-03-25—Filed