FIELD: mining.
SUBSTANCE: development method of tube-like thick steep and flat dipping ore bodies involves preparatory and first works, second mining with vertical cuttings along the spread or across the spread by means of drilling method for resources with large-diameter wells, ore output and goaf stowing. At that, width of cuttings is accepted equal to diameter of production well and second working is performed in cuttings in three stages. At the first stage the removed cutting is drilled along its length with transverse rows of vertical blasting wells throughout the height of the mining level. In the middle between the drilled transverse rows of blasting wells there drilled by means of known methods are scavenger wells and ore mass broken during drilling is shrunken owing to its partial drawing. At the second stage of the second mining of the cutting there drawn is ore mass shrunken in scavenger wells with further blasting of transverse rows of vertical wells throughout the height of the mining level and output of ore mass broken by blasting operations. At the third stage there filled is the worked-out area of the cutting with hardening stowing mixture.
EFFECT: higher efficiency of the development, crushing quality of the produced ore and creation of safe conditions for mining activities at high level of their mechanisation.
5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF UNDERGROUND DEVELOPMENT OF THIN VEINS | 2010 |
|
RU2418167C1 |
METHOD FOR STEEPLY DIPPING ORE BODY DEVELOPMENT | 2006 |
|
RU2319011C2 |
METHOD FOR UNDERGROUND DEVELOPMENT OF KIMBERLITE PIPES | 2019 |
|
RU2709846C1 |
UNDERGROUND DEVELOPMENT METHOD OF THICK MINERAL DEPOSITS | 2010 |
|
RU2448249C2 |
METHOD FOR UNDERGROUND MINING OF VEIN DEPOSITS | 2011 |
|
RU2487998C2 |
METHOD TO MINE LARGE SLOPING ORE BODIES | 2010 |
|
RU2449125C1 |
METHOD FOR DEVELOPING THIN AND LOW-POWERED STEEL-FALLING ORE BODIES | 2021 |
|
RU2755287C1 |
METHOD OF MINING ORE BEDS | 0 |
|
SU1448051A1 |
EXCAVATION METHOD OF HEAVY-PITCHING THICK AND AVERAGE THICK ORE DEPOSITS WITH COMPLICATED STRUCTURE | 2006 |
|
RU2327038C1 |
METHOD FOR UNDERGROUND DEVELOPMENT OF SLOPING AND INCLINED ORE BODIES OF LOW AND MEDIUM INTENSITY | 2010 |
|
RU2441163C1 |
Authors
Dates
2012-03-10—Published
2010-07-07—Filed