METHOD TO DEVELOP DEPOSIT WITH FORCED PRODUCT OFFTAKE AND DEVICE FOR ITS REALISATION Russian patent published in 2012 - IPC E21B43/12 

Abstract RU 2447269 C1

FIELD: oil and gas industry.

SUBSTANCE: method includes production from a bed with a water-oil mixture in a forced mode, separation of the product into oil and water, and pumping of the released water into the bed for water intake. According to the invention, an overlying bed is opened in the well for water intake, a device is lowered into the well in the form of a lower pump and an upper pump, the inlet device of which is made as a pipe between a casing pipe and a pipe string, providing for total speed of flow during water and oil offtake that is lower than the speed of oil floating in water to separate the product in the well into oil and water. At the same time the released water is pumped with the lower pump into the bed for water intake. Pumps are selected with efficiency corresponding to watering of the bed produce, and total efficiency providing for forced offtake of the product with water and oil mixture. The device comprises pumps with drives made as capable of their serial arrangement on the pipe string in the well and having inlet and outlet devices, and a packer capable of arrangement between beds in the well, one of which is with a water-oil mixture, and the other one is intended for water intake. The inlet device of the upper pump is made as a cylindrical reservoir with an inlet side hole communicated with a bed holding a water-oil mixture, and the outlet device of this pump is made as a valve unit that lets oil through into a pipe string. The outlet device of the lower pump is made in the form of a channel with an injection valve to inject water into a bed intended for water intake, and the inlet device - in the form of a channel with a suction valve for pumping of settled water into the pump. According to the invention, the reservoir is made in the form of a pipe arranged between a casing pipe and a pipe string with the area of the inner circular section that provides for total speed of flow during water offtake with a lower pump and oil with an upper pump, which is lower than the speed of oil floating in water during intensive offtake in the reservoir. The side hole of the reservoir is arranged below the foot of the bed with water-oil mixture and the inlet of the upper pump by at least 1 m. At the same time above the upper bed designed to intake water, between the casing string and the reservoir, which is made as open at the bottom, there is an additional packet installed, and a channel of the outlet device of the lower pump is communicated with an internal packer space of the well, besides, the side hole of the reservoir is arranged above the inlet device of the lower pump at least by 1 m and below the dynamic level of the water and oil contact.

EFFECT: higher oil recovery of producing formations due to lower watering of the products, limitation of water offtake, higher gradient of pressure in borehole environment of the bed.

2 cl

Similar patents RU2447269C1

Title Year Author Number
DEVELOPMENT METHOD OF DEPOSIT WITH FORCED PRODUCT WITHDRAWAL, AND DEVICE FOR ITS IMPLEMENTATION 2010
  • Bakirov Il'Shat Mukhametovich
  • Nasybullin Arslan Valer'Evich
  • Osnos Vladimir Borisovich
  • Kijamova Diljara Talgatovna
RU2446276C1
WELL PUMPING FIXTURE FOR OIL EXTRACTION AND FOR PUMPING WATER INTO BED 2007
  • Musin Kamil' Mugammarovich
  • Salakhov Linar Tagirovich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Osnos Vladimir Borisovich
RU2339794C1
WELL PUMP FACILITY FOR OIL PRODUCTION AND WATER INJECTION TO STRATUM 2007
  • Musin Kamil' Mugammarovich
  • Salakhov Linar Tagirovich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Osnos Vladimir Borisovich
RU2334079C1
PROCEDURE FOR DEVELOPMENT OF OIL-WATER DEPOSIT 2010
  • Ibatullin Ravil' Rustamovich
  • Fajzullin Ilfat Nagimovich
  • Ramazanov Rashit Gaznavievich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Osnos Vladimir Borisovich
RU2431737C1
PROCEDURE FOR DEVELOPMENT OF OIL-WATER DEPOSIT 2010
  • Fajzullin Ilfat Nagimovich
  • Ramazanov Rashit Gaznavievich
  • Zijatdinov Radik Zjauzjatovich
  • Strakhov Dmitrij Vital'Evich
  • Asadullin Marat Fagimovich
  • Osnos Vladimir Borisovich
RU2421606C1
METHOD OF ACTION ON PRE-BOTTOM ZONE OF WELL IN HYDROCARBON FIELD WITH BOTTOM WATER AND RECOVERY OF OIL AND WATER BY PUMPS-COMPRESSORS WITH SEPARATE INTAKE FOR CONELESS OPERATION OF WELL 2005
  • Kljushin Ivan Jakovlevich
  • Kljushin Aleksandr Ivanovich
RU2293214C2
DEVICE FOR SIMULTANEOUS SEPARATE EXTRACTION OF WELL PRODUCT AND FOR FORCING WATER INTO FORMATION 2006
  • Ibragimov Nail' Gabdulbarievich
  • Taziev Mirgazijan Zakievich
  • Zakirov Ajrat Fikusovich
  • Rakhmanov Ajrat Rafkatovich
  • Ozheredov Evgenij Vital'Evich
  • Dzhafarov Mirzakhan Atakishi Ogly
RU2297521C1
DEVICE FOR EXTRACTION OF WELL PRODUCT AND WATER PUMPING TO FORMATION 2010
  • Khalimov Radik Rasifovich
  • Nabiullin Rustem Fakhrasovich
  • Gusmanov Ajnur Rafkatovich
  • Gubaev Rim Salikhovich
  • Sulejmanov Farid Bashirovich
RU2443858C2
METHOD FOR EXTRACTING AN OIL POOL 2006
  • Khisamov Rais Salikhovich
  • Evdokimov Aleksandr Mikhajlovich
  • Akhmetov Nail' Zangirovich
RU2290502C1
DEVELOPMENT METHOD OF WATER-OIL RESERVOIR 2020
  • Rakhmaev Lenar Gambarovich
  • Gutorov Iulii Andreevich
RU2732742C1

RU 2 447 269 C1

Authors

Bakirov Il'Shat Mukhametovich

Nasybullin Arslan Valer'Evich

Osnos Vladimir Borisovich

Kijamova Diljara Talgatovna

Dates

2012-04-10Published

2010-12-17Filed