DEVELOPMENT METHOD OF DEPOSIT WITH FORCED PRODUCT WITHDRAWAL, AND DEVICE FOR ITS IMPLEMENTATION Russian patent published in 2012 - IPC E21B43/12 

Abstract RU 2446276 C1

FIELD: oil and gas industry.

SUBSTANCE: method involves extraction of product from formation with water-oil mixture in forced mode, separation of product into oil and water and pumping of separated water to water receiving formation. According to the invention, drilling of lower water receiving formation is performed; device in the form of lower pump and upper pump is lowered into the well; inlet system of the above device is made in the form of a pipe between casing pipe and pipe string, which provides total flow velocity at water and oil extraction, which is less than floating-up velocity of oil in water for separation of product in well into water and oil. Separated water is pumped with lower pump to water receiving formation; at that, pumps are chosen with the capacity corresponding to formation product water content and total capacity providing the forced product extraction from the formation with water-oil mixture. Device includes pumps with drives, which have the possibility of being located in series on pipe string in the well and have inlet and outlet devices, and packer having the possibility of being located between formations in the well, the upper one of which has water-oil mixture, and lower one is intended to receive water. Inlet device of upper pump is made in the form of cylindrical capacity with side inlet hole interconnected with formation containing water-oil mixture, and outlet device of this pump is made in the form of valve unit passing the oil to pipe string. Outlet device of lower pump is made in the form of channel with water delivery valve to the formation intended to receive water, and inlet device is made in the form of channel with suction valve for pumping of settled water to the pump. At that, annular section area outside the capacity is chosen so that maximum flow velocity of water-oil mixture downstream of this section exceeds floating-up velocity of oil in water. At that, capacity is made in the form of a pipe located between casing pipe and pipe string with inner annular section area providing the total flow velocity at water extraction with lower pump and oil extraction with upper pump, which is lower than floating-up velocity of oil in water at intense extraction in the capacity. Side hole of the capacity is located at least 1 m below bottom of formation containing water-oil mixture and inlet of upper pump. At that, inlet device of lower pump is interconnected with the capacity at least 1 m below side hole. Capacity is closed from below with a plug with a connection pipe interconnected with outlet device of lower pump and with borehole space.

EFFECT: increasing oil recovery owing to increasing reservoir coverage coefficient at water flooding at advanced stage of development, and reducing material costs.

3 cl, 1 dwg

Similar patents RU2446276C1

Title Year Author Number
METHOD TO DEVELOP DEPOSIT WITH FORCED PRODUCT OFFTAKE AND DEVICE FOR ITS REALISATION 2010
  • Bakirov Il'Shat Mukhametovich
  • Nasybullin Arslan Valer'Evich
  • Osnos Vladimir Borisovich
  • Kijamova Diljara Talgatovna
RU2447269C1
PROCEDURE FOR DEVELOPMENT OF OIL-WATER DEPOSIT 2010
  • Ibatullin Ravil' Rustamovich
  • Fajzullin Ilfat Nagimovich
  • Ramazanov Rashit Gaznavievich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Osnos Vladimir Borisovich
RU2431737C1
WELL PUMPING FIXTURE FOR OIL EXTRACTION AND FOR PUMPING WATER INTO BED 2007
  • Musin Kamil' Mugammarovich
  • Salakhov Linar Tagirovich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Osnos Vladimir Borisovich
RU2339794C1
PROCEDURE FOR DEVELOPMENT OF OIL-WATER DEPOSIT 2010
  • Fajzullin Ilfat Nagimovich
  • Ramazanov Rashit Gaznavievich
  • Zijatdinov Radik Zjauzjatovich
  • Strakhov Dmitrij Vital'Evich
  • Asadullin Marat Fagimovich
  • Osnos Vladimir Borisovich
RU2421606C1
WELL PUMP FACILITY FOR OIL PRODUCTION AND WATER INJECTION TO STRATUM 2007
  • Musin Kamil' Mugammarovich
  • Salakhov Linar Tagirovich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Osnos Vladimir Borisovich
RU2334079C1
WATER-OIL FIELD DEVELOPMENT METHOD 2008
  • Abdulmazitov Rafil' Ginijatullovich
  • Ramazanov Rashit Gaznavievich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Osnos Vladimir Borisovich
RU2380527C1
METHOD OF ACTION ON PRE-BOTTOM ZONE OF WELL IN HYDROCARBON FIELD WITH BOTTOM WATER AND RECOVERY OF OIL AND WATER BY PUMPS-COMPRESSORS WITH SEPARATE INTAKE FOR CONELESS OPERATION OF WELL 2005
  • Kljushin Ivan Jakovlevich
  • Kljushin Aleksandr Ivanovich
RU2293214C2
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT 2010
  • Ibatullin Ravil' Rustamovich
  • Fajzullin Ilfat Nagimovich
  • Ramazanov Rashit Gaznavievich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Osnos Vladimir Borisovich
RU2418943C1
DEVICE FOR SIMULTANEOUS SEPARATE EXTRACTION OF WELL PRODUCT AND FOR FORCING WATER INTO FORMATION 2006
  • Ibragimov Nail' Gabdulbarievich
  • Taziev Mirgazijan Zakievich
  • Zakirov Ajrat Fikusovich
  • Rakhmanov Ajrat Rafkatovich
  • Ozheredov Evgenij Vital'Evich
  • Dzhafarov Mirzakhan Atakishi Ogly
RU2297521C1
DEVICE FOR EXTRACTION OF WELL PRODUCT AND WATER PUMPING TO FORMATION 2010
  • Khalimov Radik Rasifovich
  • Nabiullin Rustem Fakhrasovich
  • Gusmanov Ajnur Rafkatovich
  • Gubaev Rim Salikhovich
  • Sulejmanov Farid Bashirovich
RU2443858C2

RU 2 446 276 C1

Authors

Bakirov Il'Shat Mukhametovich

Nasybullin Arslan Valer'Evich

Osnos Vladimir Borisovich

Kijamova Diljara Talgatovna

Dates

2012-03-27Published

2010-12-17Filed