FIELD: mining.
SUBSTANCE: method includes supplying pulp under excessive pressure via a safety device. The safety device is arranged as a tee, one end of which is connected to a bottomhole pulp line, the second one - to a sealer, and a safety membrane is installed on the third one. At the same time the output of wells in the backfilled chamber is arranged near its roof.
EFFECT: higher extent of chambers filling with a backfilling material with reduction of labour costs.
2 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR HYDRAULIC BACKFILLING OF CHAMBERS | 2016 |
|
RU2636070C1 |
METHOD OF WORKING-OUT BACKFILLING IN FLOODED POTASSIUM MINE | 2011 |
|
RU2477371C1 |
METHOD OF HYDRAULIC FILL OF CHAMBERS ON GENTLY SLOPING BEDS | 1999 |
|
RU2166639C1 |
METHOD OF REMOVING BRINE DURING FILLING CHAMBERS | 2018 |
|
RU2693086C1 |
METHOD OF FORMATION OF HYDRAULIC FILL MASS IN GOB WITH PILLAR-AND-ROOM MINING SYSTEM | 2000 |
|
RU2178084C1 |
METHOD FOR HYDRAULIC FILLING OF WORKED-OUT SPACE | 1997 |
|
RU2117162C1 |
METHOD FOR SECONDARY TREATMENT OF SALT BED | 2011 |
|
RU2468206C1 |
METHOD FOR HYDRAULIC FILLING OF LONG SINGLE MINE WORKINGS | 2008 |
|
RU2384711C1 |
METHOD OF PREVENTION OF FLOODING OF POTASSIUM MINES AND HAZARDOUS DEFORMATIONS OF EARTH SURFACE AT UNDERGROUND WATER INRUSH INTO MINES | 2007 |
|
RU2341658C1 |
METHOD OF SLURRY BACKFILLING | 2011 |
|
RU2459086C1 |
Authors
Dates
2012-04-27—Published
2010-12-03—Filed