FIELD: mining; applicable in mining of mineral deposits of syncline profile with filling of chambers. SUBSTANCE: method includes construction of inclined filtering members, supply of pulp to chamber and withdrawal of filtered water. Filling of chambers is carried out in two stages. First, filled simultaneously is one part of chamber and preliminarily made interchamber connection and leaving gap between fill mass and connection roof. Then, installed in chamber at connection is inclined filtering member with height exceeding design height of fill mass, and final filling of chamber is fulfilled. EFFECT: reduced expenses for erection of fill mass with its better dewatering. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REMOVING BRINE DURING FILLING CHAMBERS | 2018 |
|
RU2693086C1 |
METHOD OF HYDRAULIC FILL | 2012 |
|
RU2498077C1 |
CREATION OF FILLING MASSIF AT DEVELOPMENT OF DEPOSIT UNDER PERMAFROST CONDITIONS | 2013 |
|
RU2521234C1 |
METHOD OF HYDRAULIC FILL | 2012 |
|
RU2498078C1 |
METHOD OF HYDRAULIC FLUSHING | 2011 |
|
RU2462599C1 |
ERECTION OF FILLING MASS AT WORKING OF DEPOSITS UNDER PERMAFROST CONDITIONS | 2014 |
|
RU2570698C1 |
METHOD OF LAYER-BY-LAYER LAYING OF CLAY-SALT SLIMES AND SALT WASTES IN ONE CHAMBER | 2009 |
|
RU2410543C1 |
METHOD FOR HYDRAULIC FILLING OF LONG SINGLE MINE WORKINGS | 2008 |
|
RU2384711C1 |
METHOD FOR HYDRAULIC FILLING OF CHAMBERS | 2010 |
|
RU2449130C1 |
METHOD OF SLURRY BACKFILLING | 2011 |
|
RU2459086C1 |
Authors
Dates
2001-05-10—Published
1999-12-29—Filed